Hammond Manufacturing 374BXP
- Part No.:
- 374BXP
- Manufacturer:
- Hammond Manufacturing
- Category:
- Power Transformers
- Package:
- Datasheet:
-
374BXP.pdf
- Description:
- PWR XFMR LAMINATED 200VA CHAS MT
- Quantity:
- Payment:

- Shipping:

Inventory:3,617
Please send an inquiry. Send us your inquiry, and we will respond immediately.
374BXP Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Hammond Manufacturing
- Series:
- 300
- Packaging:
- Bulk
- Product Status:
- Active
- Type:
- Laminated Core
- Voltage - Primary:
- 100V, 110V, 120V, 200V, 220V, 240V
- Voltage - Secondary (Full Load):
- 750V, 6.3V, 5V
- Current - Output (Max):
- 201mA, 5A, 3A
- Primary Winding(s):
- Dual, Multiple Taps
- Secondary Winding(s):
- Triple
- Center Tap:
- Yes
- Power - Max:
- 200VA
- Mounting Type:
- Chassis Mount
- Termination Style:
- Wire Leads
- Size / Dimension:
- 99.95mm L x 95.25mm W
- Height - Seated (Max):
- 115.90mm
- Voltage - Isolation:
- 2000Vrms
- Weight:
- 8.5 lbs (3.9 kg)
374BXP FAQ
1.How can I place an order for 374BXP through Aetrix?
Please submit a Request for Quotation (RFQ) for 374BXP on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for 374BXP reliable?
The price and inventory of 374BXP are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for 374BXP is usually 5 days.
3.What payment methods are accepted for 374BXP?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for 374BXP transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for 374BXP?
374BXP orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your 374BXP order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for 374BXP?
For technical support, including 374BXP datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your 374BXP requirements.
6.How does Aetrix verify that 374BXP is sourced from the original manufacturer or authorized distributors?
All 374BXP products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that 374BXP meets industry standards.
7.What is the process for return or replacement of 374BXP?
All 374BXP units undergo pre-shipment inspection (PSI). If there is an issue with 374BXP, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The 374BXP part is unused and in its original packaging.
Return procedure for 374BXP:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
374BXP Tags
-
FS12-090-C2
Triad Magnetics
-
FS24-045-C2
Triad Magnetics
-
F12-200-C2
Triad Magnetics
-
FS20-120-C2
Triad Magnetics
-
FS24-100-C2
Triad Magnetics
-
FS12-200-C2
Triad Magnetics

-
VPP28-090
Triad Magnetics

-
PL5.0-24-130B
Tamura

-
ST-3-24
Signal Transformer

-
VPP24-100
Triad Magnetics

-
VPP10-250
Triad Magnetics
-
F24-250-C2
Triad Magnetics
Tech Hub
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…

