C&K 7105SCWWBE
- Part No.:
- 7105SCWWBE
- Manufacturer:
- C&K
- Category:
- Toggle Switches
- Package:
- Datasheet:
-
7105SCWWBE.pdf
- Description:
- SWITCH TOGGLE SPDT 0.4VA 20V
- Quantity:
- Payment:

- Shipping:

Inventory:4,482
Please send an inquiry. Send us your inquiry, and we will respond immediately.
7105SCWWBE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- 7000
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Panel Mount
- Circuit:
- SPDT
- Switch Function:
- Mom-Off-Mom
- Current Rating (Amps):
- 0.4VA (AC/DC)
- Voltage Rating - AC:
- 20 V
- Voltage Rating - DC:
- 20 V
- Actuator Type:
- Standard Round
- Actuator Length:
- 10.67mm
- Illumination:
- Non-Illuminated
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- Wire Wrap
- Panel Cutout Dimensions:
- Circular - 6.35mm Dia
- Bushing Thread:
- 1/4-40
- Ingress Protection:
- IP67 - Dust Tight, Waterproof
- Features:
- Epoxy Sealed Terminals
- Operating Temperature:
- -30°C ~ 85°C
7105SCWWBE FAQ
1.How can I place an order for 7105SCWWBE through Aetrix?
Please submit a Request for Quotation (RFQ) for 7105SCWWBE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for 7105SCWWBE reliable?
The price and inventory of 7105SCWWBE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for 7105SCWWBE is usually 5 days.
3.What payment methods are accepted for 7105SCWWBE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for 7105SCWWBE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for 7105SCWWBE?
7105SCWWBE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your 7105SCWWBE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for 7105SCWWBE?
For technical support, including 7105SCWWBE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your 7105SCWWBE requirements.
6.How does Aetrix verify that 7105SCWWBE is sourced from the original manufacturer or authorized distributors?
All 7105SCWWBE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that 7105SCWWBE meets industry standards.
7.What is the process for return or replacement of 7105SCWWBE?
All 7105SCWWBE units undergo pre-shipment inspection (PSI). If there is an issue with 7105SCWWBE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The 7105SCWWBE part is unused and in its original packaging.
Return procedure for 7105SCWWBE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
7105SCWWBE Tags

-
ANT11SECQE
CIT Relay and Switch

-
ANT11SEBQE
CIT Relay and Switch

-
ANT11SF1CQE
CIT Relay and Switch

-
ANT13SECQE
CIT Relay and Switch

-
100SP1T1B4M2QE
E-Switch

-
100SP1T1B1M1QEH
E-Switch

-
100SP1T1B1M2QEH
E-Switch

-
100SP1T2B3M1QEH
E-Switch

-
100SP3T1B1M2QE
E-Switch

-
200AWMSP1T2A1M2RE
E-Switch

-
100SP3T1B1M2QEH
E-Switch

-
200USP1T1A1M2RE
E-Switch
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

