Omron Automation and Safety A2W-TC-WC1 US1BY
- Part No.:
- A2W-TC-WC1 US1BY
- Manufacturer:
- Omron Automation and Safety
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
A2W-TC-WC1 US1BY.pdf
- Description:
- WIRELESS PB MUSHRM BLK YEL
- Quantity:
- Payment:

- Shipping:

Inventory:2,092
Please send an inquiry. Send us your inquiry, and we will respond immediately.
A2W-TC-WC1 US1BY Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Omron Automation and Safety
- Series:
- A2W
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Chassis Mount
- Type:
- Standard
- Circuit:
- -
- Switch Function:
- -
- Current Rating (Amps):
- -
- Voltage Rating - AC:
- -
- Voltage Rating - DC:
- -
- Actuator Type:
- Round, Button, Mushroom
- Actuator Marking:
- No Marking
- Color - Actuator/Cap:
- Black
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- Wireless
- Ingress Protection:
- IP65 - Dust Tight, Water Resistant
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -10°C ~ 55°C
A2W-TC-WC1 US1BY FAQ
1.How can I place an order for A2W-TC-WC1 US1BY through Aetrix?
Please submit a Request for Quotation (RFQ) for A2W-TC-WC1 US1BY on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for A2W-TC-WC1 US1BY reliable?
The price and inventory of A2W-TC-WC1 US1BY are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for A2W-TC-WC1 US1BY is usually 5 days.
3.What payment methods are accepted for A2W-TC-WC1 US1BY?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for A2W-TC-WC1 US1BY transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for A2W-TC-WC1 US1BY?
A2W-TC-WC1 US1BY orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your A2W-TC-WC1 US1BY order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for A2W-TC-WC1 US1BY?
For technical support, including A2W-TC-WC1 US1BY datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your A2W-TC-WC1 US1BY requirements.
6.How does Aetrix verify that A2W-TC-WC1 US1BY is sourced from the original manufacturer or authorized distributors?
All A2W-TC-WC1 US1BY products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that A2W-TC-WC1 US1BY meets industry standards.
7.What is the process for return or replacement of A2W-TC-WC1 US1BY?
All A2W-TC-WC1 US1BY units undergo pre-shipment inspection (PSI). If there is an issue with A2W-TC-WC1 US1BY, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The A2W-TC-WC1 US1BY part is unused and in its original packaging.
Return procedure for A2W-TC-WC1 US1BY:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
A2W-TC-WC1 US1BY Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

