NKK Switches B12HV
- Part No.:
- B12HV
- Manufacturer:
- NKK Switches
- Category:
- Toggle Switches
- Package:
- Datasheet:
-
B12HV.pdf
- Description:
- SWITCH TOGGLE SPDT 0.4VA 28V
- Quantity:
- Payment:

- Shipping:

Inventory:2,245
Please send an inquiry. Send us your inquiry, and we will respond immediately.
B12HV Specifications
- Product attributes
- Attribute value
- Manufacturer:
- NKK Switches
- Series:
- B
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Through Hole, Right Angle, Vertical
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 0.4VA (AC/DC)
- Voltage Rating - AC:
- 28 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Flatted
- Actuator Length:
- 6.30mm
- Illumination:
- Non-Illuminated
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- PC Pin
- Panel Cutout Dimensions:
- -
- Bushing Thread:
- Unthreaded
- Ingress Protection:
- -
- Features:
- Epoxy Sealed Terminals
- Operating Temperature:
- -30°C ~ 85°C
B12HV FAQ
1.How can I place an order for B12HV through Aetrix?
Please submit a Request for Quotation (RFQ) for B12HV on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for B12HV reliable?
The price and inventory of B12HV are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for B12HV is usually 5 days.
3.What payment methods are accepted for B12HV?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for B12HV transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for B12HV?
B12HV orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your B12HV order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for B12HV?
For technical support, including B12HV datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your B12HV requirements.
6.How does Aetrix verify that B12HV is sourced from the original manufacturer or authorized distributors?
All B12HV products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that B12HV meets industry standards.
7.What is the process for return or replacement of B12HV?
All B12HV units undergo pre-shipment inspection (PSI). If there is an issue with B12HV, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The B12HV part is unused and in its original packaging.
Return procedure for B12HV:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
B12HV Tags

-
ANT11SECQE
CIT Relay and Switch

-
ANT11SEBQE
CIT Relay and Switch

-
ANT11SF1CQE
CIT Relay and Switch

-
ANT13SECQE
CIT Relay and Switch

-
100SP1T1B4M2QE
E-Switch

-
100SP1T1B1M1QEH
E-Switch

-
100SP1T1B1M2QEH
E-Switch

-
100SP1T2B3M1QEH
E-Switch

-
100SP3T1B1M2QE
E-Switch

-
200AWMSP1T2A1M2RE
E-Switch

-
100SP3T1B1M2QEH
E-Switch

-
200USP1T1A1M2RE
E-Switch
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

