CW Industries GTB2B13C
- Part No.:
- GTB2B13C
- Manufacturer:
- CW Industries
- Category:
- Toggle Switches
- Package:
- Datasheet:
-
GTB2B13C.pdf
- Description:
- SWITCH TOGGLE SPDT 12A 125V
- Quantity:
- Payment:

- Shipping:

Inventory:4,936
Please send an inquiry. Send us your inquiry, and we will respond immediately.
GTB2B13C Specifications
- Product attributes
- Attribute value
- Manufacturer:
- CW Industries
- Series:
- GTB
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Panel Mount
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 12A (AC)
- Voltage Rating - AC:
- 240 V
- Voltage Rating - DC:
- -
- Actuator Type:
- Standard Round
- Actuator Length:
- 16.20mm
- Illumination:
- Non-Illuminated
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- Quick Connect - 0.250" (6.3mm)
- Panel Cutout Dimensions:
- Circular - 12.00mm Dia
- Bushing Thread:
- 15/32-32
- Ingress Protection:
- IP68 - Dust Tight, Waterproof
- Features:
- -
- Operating Temperature:
- -
GTB2B13C FAQ
1.How can I place an order for GTB2B13C through Aetrix?
Please submit a Request for Quotation (RFQ) for GTB2B13C on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for GTB2B13C reliable?
The price and inventory of GTB2B13C are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for GTB2B13C is usually 5 days.
3.What payment methods are accepted for GTB2B13C?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for GTB2B13C transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for GTB2B13C?
GTB2B13C orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your GTB2B13C order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for GTB2B13C?
For technical support, including GTB2B13C datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your GTB2B13C requirements.
6.How does Aetrix verify that GTB2B13C is sourced from the original manufacturer or authorized distributors?
All GTB2B13C products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that GTB2B13C meets industry standards.
7.What is the process for return or replacement of GTB2B13C?
All GTB2B13C units undergo pre-shipment inspection (PSI). If there is an issue with GTB2B13C, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The GTB2B13C part is unused and in its original packaging.
Return procedure for GTB2B13C:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
GTB2B13C Tags

-
ANT11SECQE
CIT Relay and Switch

-
ANT11SEBQE
CIT Relay and Switch

-
ANT11SF1CQE
CIT Relay and Switch

-
ANT13SECQE
CIT Relay and Switch

-
100SP1T1B4M2QE
E-Switch

-
100SP1T1B1M1QEH
E-Switch

-
100SP1T1B1M2QEH
E-Switch

-
100SP1T2B3M1QEH
E-Switch

-
100SP3T1B1M2QE
E-Switch

-
200AWMSP1T2A1M2RE
E-Switch

-
100SP3T1B1M2QEH
E-Switch

-
200USP1T1A1M2RE
E-Switch
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

