NKK Switches HB215SKG03CE
- Part No.:
- HB215SKG03CE
- Manufacturer:
- NKK Switches
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
HB215SKG03CE.pdf
- Description:
- SWITCH PUSH SPST-NO 0.4VA 28V
- Quantity:
- Payment:

- Shipping:

Inventory:148
Please send an inquiry. Send us your inquiry, and we will respond immediately.
HB215SKG03CE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- NKK Switches
- Series:
- HB2
- Packaging:
- Box
- Product Status:
- Last Time Buy
- Mounting Type:
- Through Hole
- Type:
- Standard, Illuminated
- Circuit:
- SPST-NO
- Switch Function:
- Off-Mom
- Current Rating (Amps):
- 0.4VA (AC/DC)
- Voltage Rating - AC:
- 28 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Plunger for Cap
- Actuator Marking:
- No Marking
- Color - Actuator/Cap:
- -
- Illumination Type, Color:
- LED, Red/Yellow
- Illumination Voltage (Nominal):
- 2.0, 2.1 VDC
- Termination Style:
- PC Pin
- Ingress Protection:
- -
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -25°C ~ 50°C
HB215SKG03CE FAQ
1.How can I place an order for HB215SKG03CE through Aetrix?
Please submit a Request for Quotation (RFQ) for HB215SKG03CE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for HB215SKG03CE reliable?
The price and inventory of HB215SKG03CE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for HB215SKG03CE is usually 5 days.
3.What payment methods are accepted for HB215SKG03CE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for HB215SKG03CE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for HB215SKG03CE?
HB215SKG03CE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your HB215SKG03CE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for HB215SKG03CE?
For technical support, including HB215SKG03CE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your HB215SKG03CE requirements.
6.How does Aetrix verify that HB215SKG03CE is sourced from the original manufacturer or authorized distributors?
All HB215SKG03CE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that HB215SKG03CE meets industry standards.
7.What is the process for return or replacement of HB215SKG03CE?
All HB215SKG03CE units undergo pre-shipment inspection (PSI). If there is an issue with HB215SKG03CE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The HB215SKG03CE part is unused and in its original packaging.
Return procedure for HB215SKG03CE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
HB215SKG03CE Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

