C&K PS22F42R5NS
- Part No.:
- PS22F42R5NS
- Manufacturer:
- C&K
- Category:
- Pushbutton Switches
- Package:
- Description:
- SWITCH PUSHBUTTON
- Quantity:
- Payment:

- Shipping:

Inventory:1,893
Please send an inquiry. Send us your inquiry, and we will respond immediately.
PS22F42R5NS Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- -
- Packaging:
- Bulk
- Product Status:
- Obsolete
- Mounting Type:
- -
- Type:
- -
- Circuit:
- -
- Switch Function:
- -
- Current Rating (Amps):
- -
- Voltage Rating - AC:
- -
- Voltage Rating - DC:
- -
- Actuator Type:
- -
- Actuator Marking:
- -
- Color - Actuator/Cap:
- -
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- -
- Ingress Protection:
- -
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -
PS22F42R5NS FAQ
1.How can I place an order for PS22F42R5NS through Aetrix?
Please submit a Request for Quotation (RFQ) for PS22F42R5NS on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for PS22F42R5NS reliable?
The price and inventory of PS22F42R5NS are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for PS22F42R5NS is usually 5 days.
3.What payment methods are accepted for PS22F42R5NS?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for PS22F42R5NS transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for PS22F42R5NS?
PS22F42R5NS orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your PS22F42R5NS order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for PS22F42R5NS?
For technical support, including PS22F42R5NS datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your PS22F42R5NS requirements.
6.How does Aetrix verify that PS22F42R5NS is sourced from the original manufacturer or authorized distributors?
All PS22F42R5NS products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that PS22F42R5NS meets industry standards.
7.What is the process for return or replacement of PS22F42R5NS?
All PS22F42R5NS units undergo pre-shipment inspection (PSI). If there is an issue with PS22F42R5NS, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The PS22F42R5NS part is unused and in its original packaging.
Return procedure for PS22F42R5NS:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
PS22F42R5NS Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

