Hewlett Packard Enterprise R9W86A
- Part No.:
- R9W86A
- Manufacturer:
- Hewlett Packard Enterprise
- Category:
- Switches, Hubs
- Package:
- Datasheet:
-
R9W86A.pdf
- Description:
- HPE Aruba Networking CX 8100 24x
- Quantity:
- Payment:

- Shipping:

Inventory:1,127
Please send an inquiry. Send us your inquiry, and we will respond immediately.
R9W86A Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Hewlett Packard Enterprise
- Series:
- Aruba CX 8100
- Packaging:
- Retail Package
- Product Status:
- Active
- Type:
- Switch - Managed
- Configuration:
- Fixed + SFP
- Number of Ports:
- 28
- Copper Ports:
- -
- Copper Type:
- -
- Fiber Ports:
- 28
- Fiber Type:
- SFP, SFP+
- SFP/XFP Ports:
- 28
- SFP/XFP Type:
- SFP, SFP+
- PoE Ports:
- -
- Connector Type:
- RJ45, SFP
- Voltage - Input:
- 100 ~ 127VAC, 200 ~ 240VAC
- Ingress Protection:
- -
- Mounting Type:
- Rack Mount
- Operating Temperature:
- 0°C ~ 45°C
- Grade:
- -
- Qualification:
- -
R9W86A FAQ
1.How can I place an order for R9W86A through Aetrix?
Please submit a Request for Quotation (RFQ) for R9W86A on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for R9W86A reliable?
The price and inventory of R9W86A are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for R9W86A is usually 5 days.
3.What payment methods are accepted for R9W86A?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for R9W86A transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for R9W86A?
R9W86A orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your R9W86A order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for R9W86A?
For technical support, including R9W86A datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your R9W86A requirements.
6.How does Aetrix verify that R9W86A is sourced from the original manufacturer or authorized distributors?
All R9W86A products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that R9W86A meets industry standards.
7.What is the process for return or replacement of R9W86A?
All R9W86A units undergo pre-shipment inspection (PSI). If there is an issue with R9W86A, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The R9W86A part is unused and in its original packaging.
Return procedure for R9W86A:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
R9W86A Tags
Tech Hub
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…












