C&K TP21SHZQE
- Part No.:
- TP21SHZQE
- Manufacturer:
- C&K
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
TP21SHZQE.pdf
- Description:
- SWITCH PUSH DPST-NO 1A 120V
- Quantity:
- Payment:

- Shipping:

Inventory:1,854
Please send an inquiry. Send us your inquiry, and we will respond immediately.
TP21SHZQE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- TP
- Packaging:
- Bulk
- Product Status:
- Obsolete
- Mounting Type:
- Panel Mount, Rear
- Type:
- Standard
- Circuit:
- DPST-NO
- Switch Function:
- Off-Mom
- Current Rating (Amps):
- 1A (AC/DC)
- Voltage Rating - AC:
- 120 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Round, Plunger
- Actuator Marking:
- Power Symbol
- Color - Actuator/Cap:
- Black
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- Solder Lug
- Ingress Protection:
- -
- Features:
- Sealed
- Panel Cutout Dimensions:
- Circular - 4.95mm Dia
- Operating Temperature:
- -30°C ~ 85°C
TP21SHZQE FAQ
1.How can I place an order for TP21SHZQE through Aetrix?
Please submit a Request for Quotation (RFQ) for TP21SHZQE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for TP21SHZQE reliable?
The price and inventory of TP21SHZQE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for TP21SHZQE is usually 5 days.
3.What payment methods are accepted for TP21SHZQE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for TP21SHZQE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for TP21SHZQE?
TP21SHZQE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your TP21SHZQE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for TP21SHZQE?
For technical support, including TP21SHZQE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your TP21SHZQE requirements.
6.How does Aetrix verify that TP21SHZQE is sourced from the original manufacturer or authorized distributors?
All TP21SHZQE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that TP21SHZQE meets industry standards.
7.What is the process for return or replacement of TP21SHZQE?
All TP21SHZQE units undergo pre-shipment inspection (PSI). If there is an issue with TP21SHZQE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The TP21SHZQE part is unused and in its original packaging.
Return procedure for TP21SHZQE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
TP21SHZQE Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…

