C&K U11TZQE
- Part No.:
- U11TZQE
- Manufacturer:
- C&K
- Category:
- Toggle Switches
- Package:
- Datasheet:
-
U11TZQE.pdf
- Description:
- SWITCH TOGGLE SPDT 5A 120V
- Quantity:
- Payment:

- Shipping:

Inventory:3,184
Please send an inquiry. Send us your inquiry, and we will respond immediately.
U11TZQE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- 7000
- Packaging:
- Tray
- Product Status:
- Active
- Mounting Type:
- Panel Mount
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 5A (AC/DC)
- Voltage Rating - AC:
- 120 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Standard Round
- Actuator Length:
- 17.45mm
- Illumination:
- Non-Illuminated
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- Solder Lug
- Panel Cutout Dimensions:
- Circular - 11.91mm Dia
- Bushing Thread:
- 15/32-32
- Ingress Protection:
- -
- Features:
- Epoxy Sealed Terminals
- Operating Temperature:
- -30°C ~ 85°C
U11TZQE FAQ
1.How can I place an order for U11TZQE through Aetrix?
Please submit a Request for Quotation (RFQ) for U11TZQE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for U11TZQE reliable?
The price and inventory of U11TZQE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for U11TZQE is usually 5 days.
3.What payment methods are accepted for U11TZQE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for U11TZQE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for U11TZQE?
U11TZQE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your U11TZQE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for U11TZQE?
For technical support, including U11TZQE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your U11TZQE requirements.
6.How does Aetrix verify that U11TZQE is sourced from the original manufacturer or authorized distributors?
All U11TZQE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that U11TZQE meets industry standards.
7.What is the process for return or replacement of U11TZQE?
All U11TZQE units undergo pre-shipment inspection (PSI). If there is an issue with U11TZQE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The U11TZQE part is unused and in its original packaging.
Return procedure for U11TZQE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
U11TZQE Tags

-
ANT11SECQE
CIT Relay and Switch

-
ANT11SEBQE
CIT Relay and Switch

-
ANT11SF1CQE
CIT Relay and Switch

-
ANT13SECQE
CIT Relay and Switch

-
100SP1T1B4M2QE
E-Switch

-
100SP1T1B1M1QEH
E-Switch

-
100SP1T1B1M2QEH
E-Switch

-
100SP1T2B3M1QEH
E-Switch

-
100SP3T1B1M2QE
E-Switch

-
200AWMSP1T2A1M2RE
E-Switch

-
100SP3T1B1M2QEH
E-Switch

-
200USP1T1A1M2RE
E-Switch
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…
