Renesas Electronics Corporation 2P4M(14)-AZ
- Part No.:
- 2P4M(14)-AZ
- Manufacturer:
- Renesas Electronics Corporation
- Category:
- SCRs
- Package:
- -
- Datasheet:
-
2P4M(14)-AZ.pdf
- Description:
- THYRISTOR, P-GATE, 2A, 400V
- Quantity:
- Payment:

- Shipping:

Inventory:17,960
Please send an inquiry. Send us your inquiry, and we will respond immediately.
2P4M(14)-AZ Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Renesas Electronics Corporation
- Series:
- *
- Package/Case:
- -
- Packaging:
- Bulk
- Product Status:
- Active
- Voltage - Off State:
- -
- Voltage - Gate Trigger (Vgt) (Max):
- -
- Current - Gate Trigger (Igt) (Max):
- -
- Voltage - On State (Vtm) (Max):
- -
- Current - On State (It (AV)) (Max):
- -
- Current - On State (It (RMS)) (Max):
- -
- Current - Hold (Ih) (Max):
- -
- Current - Off State (Max):
- -
- Current - Non Rep. Surge 50, 60Hz (Itsm):
- -
- SCR Type:
- -
- Operating Temperature:
- -
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- -
- Supplier Device Package:
- -
2P4M(14)-AZ FAQ
1.How can I place an order for 2P4M(14)-AZ through Aetrix?
Please submit a Request for Quotation (RFQ) for 2P4M(14)-AZ on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for 2P4M(14)-AZ reliable?
The price and inventory of 2P4M(14)-AZ are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for 2P4M(14)-AZ is usually 5 days.
3.What payment methods are accepted for 2P4M(14)-AZ?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for 2P4M(14)-AZ transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for 2P4M(14)-AZ?
2P4M(14)-AZ orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your 2P4M(14)-AZ order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for 2P4M(14)-AZ?
For technical support, including 2P4M(14)-AZ datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your 2P4M(14)-AZ requirements.
6.How does Aetrix verify that 2P4M(14)-AZ is sourced from the original manufacturer or authorized distributors?
All 2P4M(14)-AZ products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that 2P4M(14)-AZ meets industry standards.
7.What is the process for return or replacement of 2P4M(14)-AZ?
All 2P4M(14)-AZ units undergo pre-shipment inspection (PSI). If there is an issue with 2P4M(14)-AZ, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The 2P4M(14)-AZ part is unused and in its original packaging.
Return procedure for 2P4M(14)-AZ:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
2P4M(14)-AZ Tags

-
MCR12DSNT4G
Littelfuse Inc.

-
2N6404G
Littelfuse Inc.

-
S4015LTP
Littelfuse Inc.

-
VS-25TTS12HM3
Vishay General Semiconductor - Diodes Division

-
S4020LTP
Littelfuse Inc.

-
MCR12MG
Littelfuse Inc.

-
MCR69-3G
Littelfuse Inc.

-
S8025LTP
Littelfuse Inc.

-
CMA30E1600PN
IXYS
-
S8016RATP
Littelfuse Inc.

-
TXN625RG
STMicroelectronics
.jpg)
-
SK055RTP
Littelfuse Inc.
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

