Siemens 52PP2LRAS
- Part No.:
- 52PP2LRAS
- Manufacturer:
- Siemens
- Category:
- Emergency Stop (E-Stop) Switches
- Package:
- Description:
- ESTOP,PP2,MTD,MODLED,24V,ILL RED
- Quantity:
- Payment:

- Shipping:

Inventory:4,614
Please send an inquiry. Send us your inquiry, and we will respond immediately.
52PP2LRAS Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Siemens
- Series:
- -
- Packaging:
- Box
- Product Status:
- Active
- Mounting Type:
- -
- Reset Operation:
- -
- Circuit:
- -
- Switch Function:
- -
- Features:
- -
- Current Rating (Amps):
- -
- Voltage Rating - AC:
- -
- Voltage Rating - DC:
- -
- Panel Cutout Dimensions:
- -
- Termination Style:
- -
- Ingress Protection:
- -
- Operating Temperature:
- -
- Illumination Voltage (Nominal):
- -
52PP2LRAS FAQ
1.How can I place an order for 52PP2LRAS through Aetrix?
Please submit a Request for Quotation (RFQ) for 52PP2LRAS on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for 52PP2LRAS reliable?
The price and inventory of 52PP2LRAS are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for 52PP2LRAS is usually 5 days.
3.What payment methods are accepted for 52PP2LRAS?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for 52PP2LRAS transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for 52PP2LRAS?
52PP2LRAS orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your 52PP2LRAS order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for 52PP2LRAS?
For technical support, including 52PP2LRAS datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your 52PP2LRAS requirements.
6.How does Aetrix verify that 52PP2LRAS is sourced from the original manufacturer or authorized distributors?
All 52PP2LRAS products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that 52PP2LRAS meets industry standards.
7.What is the process for return or replacement of 52PP2LRAS?
All 52PP2LRAS units undergo pre-shipment inspection (PSI). If there is an issue with 52PP2LRAS, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The 52PP2LRAS part is unused and in its original packaging.
Return procedure for 52PP2LRAS:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
52PP2LRAS Tags

-
YW1B-V4E01R
APEM Inc.

-
84-5020.0020
EAO

-
84-5220.0020
EAO

-
51-252.026
EAO

-
XW1E-BV402M-R
IDEC
-
84-5140.0020
EAO
-
84-5040.0020
EAO

-
84-5240.0020
EAO

-
84-5030.0020
EAO
-
51-256.025
EAO

-
84-5020.0040
EAO

-
61-6441.4047
EAO
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

