Red Lion Controls CUB4L80B
- Part No.:
- CUB4L80B
- Manufacturer:
- Red Lion Controls
- Category:
- Counters, Hour Meters
- Package:
- Description:
- COUNTER LCD CHAR PANEL MT
- Quantity:
- Payment:

- Shipping:

Inventory:3,600
Please send an inquiry. Send us your inquiry, and we will respond immediately.
CUB4L80B Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Red Lion Controls
- Series:
- -
- Packaging:
- Bulk
- Product Status:
- Obsolete
- Type:
- -
- Operating Mode:
- -
- Count Rate:
- -
- Time Format:
- -
- Number of Characters Per Row:
- -
- Display Type:
- -
- Display Characters - Height:
- -
- Input Type:
- -
- Output Type:
- -
- Voltage - Supply:
- -
- Reset:
- -
- Panel Cutout Dimensions:
- -
- Mounting Type:
- -
- Termination Style:
- -
- Ingress Protection:
- -
CUB4L80B FAQ
1.How can I place an order for CUB4L80B through Aetrix?
Please submit a Request for Quotation (RFQ) for CUB4L80B on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for CUB4L80B reliable?
The price and inventory of CUB4L80B are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for CUB4L80B is usually 5 days.
3.What payment methods are accepted for CUB4L80B?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for CUB4L80B transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for CUB4L80B?
CUB4L80B orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your CUB4L80B order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for CUB4L80B?
For technical support, including CUB4L80B datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your CUB4L80B requirements.
6.How does Aetrix verify that CUB4L80B is sourced from the original manufacturer or authorized distributors?
All CUB4L80B products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that CUB4L80B meets industry standards.
7.What is the process for return or replacement of CUB4L80B?
All CUB4L80B units undergo pre-shipment inspection (PSI). If there is an issue with CUB4L80B, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The CUB4L80B part is unused and in its original packaging.
Return procedure for CUB4L80B:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
CUB4L80B Tags

-
701PR-102
Curtis Instruments Inc.
-
701FR001048150D10023
Curtis Instruments Inc.
-
701FR00101248D2060A
Curtis Instruments Inc.
-
701DR001048150D10023
Curtis Instruments Inc.
-
701DR00101248D2060A
Curtis Instruments Inc.

-
CUB7TCS0
Red Lion Controls

-
H7EC-N-B
Omron Automation and Safety
-
H7EC-N
Omron Automation and Safety

-
CUB7CCS0
Red Lion Controls

-
H7EC-NFV-B
Omron Automation and Safety

-
H7EC-NV-B
Omron Automation and Safety

-
H7ET-NFV1-B
Omron Automation and Safety
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

