Banner Engineering Corporation K50CAPT2GREQ
- Part No.:
- K50CAPT2GREQ
- Manufacturer:
- Banner Engineering Corporation
- Category:
- Pick to Light
- Package:
- Datasheet:
-
K50CAPT2GREQ.pdf
- Description:
- K50 COMPACT SERIES: 2-COLOR TOUC
- Quantity:
- Payment:

- Shipping:

Inventory:3,620
Please send an inquiry. Send us your inquiry, and we will respond immediately.
K50CAPT2GREQ Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Banner Engineering Corporation
- Series:
- K50
- Packaging:
- Box
- Product Status:
- Active
- Mounting Type:
- Panel Mount, Front
- Actuator Type:
- Round, Button, Flush
- Circuit:
- SPST-NO
- Switch Function:
- Off-Mom
- Illumination Type, Color:
- LED, Green/Red
- Features:
- -
- Voltage - Supply:
- 12 ~ 30VDC
- Response Time:
- 50ms
- Termination Style:
- Connector (M12)
- Panel Cutout Dimensions:
- Circular - 30.00mm Dia
- Operating Temperature:
- -40°C ~ 50°C
- Ingress Protection:
- IP67/IP69K - Dust Tight, Water Resistant, Waterproof
- Approval Agency:
- CE, cULus
K50CAPT2GREQ FAQ
1.How can I place an order for K50CAPT2GREQ through Aetrix?
Please submit a Request for Quotation (RFQ) for K50CAPT2GREQ on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for K50CAPT2GREQ reliable?
The price and inventory of K50CAPT2GREQ are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for K50CAPT2GREQ is usually 5 days.
3.What payment methods are accepted for K50CAPT2GREQ?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for K50CAPT2GREQ transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for K50CAPT2GREQ?
K50CAPT2GREQ orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your K50CAPT2GREQ order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for K50CAPT2GREQ?
For technical support, including K50CAPT2GREQ datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your K50CAPT2GREQ requirements.
6.How does Aetrix verify that K50CAPT2GREQ is sourced from the original manufacturer or authorized distributors?
All K50CAPT2GREQ products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that K50CAPT2GREQ meets industry standards.
7.What is the process for return or replacement of K50CAPT2GREQ?
All K50CAPT2GREQ units undergo pre-shipment inspection (PSI). If there is an issue with K50CAPT2GREQ, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The K50CAPT2GREQ part is unused and in its original packaging.
Return procedure for K50CAPT2GREQ:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
K50CAPT2GREQ Tags

-
S22AMTSRGB7
Banner Engineering Corporation

-
S22AMTSRGB7QP
Banner Engineering Corporation

-
K50APT2GRCQ
Banner Engineering Corporation

-
K50PTAMGRY3Q
Banner Engineering Corporation

-
K50PTCAMGRY3Q
Banner Engineering Corporation

-
K50APTGRYF2Q
Banner Engineering Corporation

-
K50APTBGCQ
Banner Engineering Corporation

-
K50APFF100GREQP
Banner Engineering Corporation

-
K30APTGRF2Q
Banner Engineering Corporation

-
K30APT2GRYF2Q
Banner Engineering Corporation

-
K50APFF100GREQ
Banner Engineering Corporation

-
K50APTGRCQ
Banner Engineering Corporation
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

