Autonics LA8N-BF
- Part No.:
- LA8N-BF
- Manufacturer:
- Autonics
- Category:
- Counters, Hour Meters
- Package:
- Datasheet:
-
LA8N-BF.pdf
- Description:
- COUNTER TOTALIZER 20CPS V-INPUT
- Quantity:
- Payment:

- Shipping:

Inventory:142
Please send an inquiry. Send us your inquiry, and we will respond immediately.
LA8N-BF Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Autonics
- Series:
- LA8N
- Packaging:
- Box
- Product Status:
- Active
- Type:
- Totalizer
- Operating Mode:
- Up
- Count Rate:
- 20Hz
- Time Format:
- Multiple
- Number of Characters Per Row:
- 8
- Display Type:
- LCD - Black Characters
- Display Characters - Height:
- 0.343" (8.70mm)
- Input Type:
- Voltage
- Output Type:
- -
- Voltage - Supply:
- None Required (Battery Included)
- Reset:
- External, Front Panel
- Panel Cutout Dimensions:
- Rectangular - 45.00mm x 22.20mm
- Mounting Type:
- Panel Mount
- Termination Style:
- Screw Terminal
- Ingress Protection:
- IP65 - Dust Tight, Water Resistant
LA8N-BF FAQ
1.How can I place an order for LA8N-BF through Aetrix?
Please submit a Request for Quotation (RFQ) for LA8N-BF on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for LA8N-BF reliable?
The price and inventory of LA8N-BF are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for LA8N-BF is usually 5 days.
3.What payment methods are accepted for LA8N-BF?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for LA8N-BF transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for LA8N-BF?
LA8N-BF orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your LA8N-BF order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for LA8N-BF?
For technical support, including LA8N-BF datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your LA8N-BF requirements.
6.How does Aetrix verify that LA8N-BF is sourced from the original manufacturer or authorized distributors?
All LA8N-BF products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that LA8N-BF meets industry standards.
7.What is the process for return or replacement of LA8N-BF?
All LA8N-BF units undergo pre-shipment inspection (PSI). If there is an issue with LA8N-BF, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The LA8N-BF part is unused and in its original packaging.
Return procedure for LA8N-BF:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
LA8N-BF Tags

-
701PR-102
Curtis Instruments Inc.
-
701FR001048150D10023
Curtis Instruments Inc.
-
701FR00101248D2060A
Curtis Instruments Inc.
-
701DR001048150D10023
Curtis Instruments Inc.
-
701DR00101248D2060A
Curtis Instruments Inc.

-
CUB7TCS0
Red Lion Controls

-
H7EC-N-B
Omron Automation and Safety
-
H7EC-N
Omron Automation and Safety

-
CUB7CCS0
Red Lion Controls

-
H7EC-NFV-B
Omron Automation and Safety

-
H7EC-NV-B
Omron Automation and Safety

-
H7ET-NFV1-B
Omron Automation and Safety
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

