Banner Engineering Corporation VS4EV
- Part No.:
- VS4EV
- Manufacturer:
- Banner Engineering Corporation
- Category:
- Photoelectric, Industrial
- Package:
- Datasheet:
-
VS4EV.pdf
- Description:
- VS4 SENSOR EMITTER 2M CBL
- Quantity:
- Payment:

- Shipping:

Inventory:4,763
Please send an inquiry. Send us your inquiry, and we will respond immediately.
VS4EV Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Banner Engineering Corporation
- Series:
- VS4
- Packaging:
- Bulk
- Product Status:
- Obsolete
- Sensing Method:
- Through-Beam
- Sensing Distance:
- 39.370" (1m)
- Voltage - Supply:
- 10V ~ 30V
- Response Time:
- 1ms, 500µs
- Output Configuration:
- -
- Light Source:
- Red (660nm)
- Connection Method:
- Cable
- Ingress Protection:
- NEMA 6, IEC IP67
- Cable Length:
- 78.74" (2m)
- Adjustment Type:
- -
- Operating Temperature:
- -20°C ~ 55°C
VS4EV FAQ
1.How can I place an order for VS4EV through Aetrix?
Please submit a Request for Quotation (RFQ) for VS4EV on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for VS4EV reliable?
The price and inventory of VS4EV are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for VS4EV is usually 5 days.
3.What payment methods are accepted for VS4EV?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for VS4EV transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for VS4EV?
VS4EV orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your VS4EV order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for VS4EV?
For technical support, including VS4EV datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your VS4EV requirements.
6.How does Aetrix verify that VS4EV is sourced from the original manufacturer or authorized distributors?
All VS4EV products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that VS4EV meets industry standards.
7.What is the process for return or replacement of VS4EV?
All VS4EV units undergo pre-shipment inspection (PSI). If there is an issue with VS4EV, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The VS4EV part is unused and in its original packaging.
Return procedure for VS4EV:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
VS4EV Tags

-
2168
Adafruit Industries LLC

-
FT-42
Panasonic Industrial Automation Sales
-
PM2-LF10
Panasonic Industrial Automation Sales
-
PM2-LH10
Panasonic Industrial Automation Sales

-
T18-2NAEL-Q8
Banner Engineering Corporation

-
T18-2NAEL-2M
Banner Engineering Corporation

-
PM2-LH10-C1
Panasonic Industrial Automation Sales
-
FD-42G
Panasonic Industrial Automation Sales

-
T18-2VPRL-Q8
Banner Engineering Corporation

-
E3FA-DP11 2M
Omron Automation and Safety

-
T18-2VPRL-2M
Banner Engineering Corporation

-
S18-2VNLP-2M
Banner Engineering Corporation
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

