Ametherm ACC102
- Part No.:
- ACC102
- Manufacturer:
- Ametherm
- Category:
- NTC Thermistors
- Package:
- Bead
- Datasheet:
-
ACC102.pdf
- Description:
- THERMISTOR NTC 3KOHM 3934K BEAD
- Quantity:
- Payment:

- Shipping:

Inventory:4,756
Please send an inquiry. Send us your inquiry, and we will respond immediately.
ACC102 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Ametherm
- Series:
- Accu-Curve™
- Package/Case:
- Bead
- Packaging:
- Bulk
- Product Status:
- Active
- Resistance in Ohms @ 25°C:
- 3k
- Resistance Tolerance:
- ±0.44%
- B Value Tolerance:
- ±1%
- B0/50:
- 3892K
- B25/50:
- 3934K
- B25/75:
- 3960K
- B25/85:
- 3988K
- B25/100:
- 3999K
- Operating Temperature:
- 0°C ~ 70°C
- Power - Max:
- 250 mW
- Length - Lead Wire:
- 2.00" (50.8mm)
- Mounting Type:
- Free Hanging
- Grade:
- -
- Qualification:
- -
ACC102 FAQ
1.How can I place an order for ACC102 through Aetrix?
Please submit a Request for Quotation (RFQ) for ACC102 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for ACC102 reliable?
The price and inventory of ACC102 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for ACC102 is usually 5 days.
3.What payment methods are accepted for ACC102?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for ACC102 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for ACC102?
ACC102 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your ACC102 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for ACC102?
For technical support, including ACC102 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your ACC102 requirements.
6.How does Aetrix verify that ACC102 is sourced from the original manufacturer or authorized distributors?
All ACC102 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that ACC102 meets industry standards.
7.What is the process for return or replacement of ACC102?
All ACC102 units undergo pre-shipment inspection (PSI). If there is an issue with ACC102, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The ACC102 part is unused and in its original packaging.
Return procedure for ACC102:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
ACC102 Tags

-
NCU15XH103F6SRC
Murata Electronics

-
ERT-JZEG103FA
Panasonic Electronic Components
.jpg)
-
ERT-J0EM103J
Panasonic Electronic Components

-
NTCG103JF103FT1
TDK Corporation

-
NTCG104EF104FT1X
TDK Corporation

-
ERT-J0ER103J
Panasonic Electronic Components

-
NCP15XH103F03RC
Murata Electronics

-
NCP03WF104F05RL
Murata Electronics

-
ERT-J0EG103FA
Panasonic Electronic Components

-
NCP15WB473F03RC
Murata Electronics

-
NCP15XH103J03RC
Murata Electronics

-
ERT-J1VR103J
Panasonic Electronic Components
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

