aimtec AME1-24SJZ
- Part No.:
- AME1-24SJZ
- Manufacturer:
- aimtec
- Category:
- AC DC Converters
- Package:
- 4-DIP Module
- Datasheet:
-
AME1-24SJZ.pdf
- Description:
- AC/DC CONVERTER 24V 1W
- Quantity:
- Payment:

- Shipping:

Inventory:2,648
Please send an inquiry. Send us your inquiry, and we will respond immediately.
AME1-24SJZ Specifications
- Product attributes
- Attribute value
- Manufacturer:
- aimtec
- Series:
- AME1-JZ (1W)
- Package/Case:
- 4-DIP Module
- Packaging:
- Tube
- Product Status:
- Active
- Type:
- Enclosed
- Number of Outputs:
- 1
- Voltage - Input:
- 120 ~ 305 VAC
- Voltage - Output 1:
- 24V
- Voltage - Output 2:
- -
- Voltage - Output 3:
- -
- Voltage - Output 4:
- -
- Current - Output (Max):
- 42mA
- Power (Watts):
- 1 W
- Applications:
- ITE (Commercial)
- Features:
- -
- Operating Temperature:
- -25°C ~ 70°C (With Derating)
- Efficiency:
- 75%
- Mounting Type:
- Through Hole
- Size / Dimension:
- 1.33" L x 0.87" W x 0.71" H (33.7mm x 22.2mm x 18.0mm)
- Approval Agency:
- CE, cULus, cURus
- Standard Number:
- -
AME1-24SJZ FAQ
1.How can I place an order for AME1-24SJZ through Aetrix?
Please submit a Request for Quotation (RFQ) for AME1-24SJZ on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for AME1-24SJZ reliable?
The price and inventory of AME1-24SJZ are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for AME1-24SJZ is usually 5 days.
3.What payment methods are accepted for AME1-24SJZ?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for AME1-24SJZ transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for AME1-24SJZ?
AME1-24SJZ orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your AME1-24SJZ order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for AME1-24SJZ?
For technical support, including AME1-24SJZ datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your AME1-24SJZ requirements.
6.How does Aetrix verify that AME1-24SJZ is sourced from the original manufacturer or authorized distributors?
All AME1-24SJZ products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that AME1-24SJZ meets industry standards.
7.What is the process for return or replacement of AME1-24SJZ?
All AME1-24SJZ units undergo pre-shipment inspection (PSI). If there is an issue with AME1-24SJZ, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The AME1-24SJZ part is unused and in its original packaging.
Return procedure for AME1-24SJZ:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
AME1-24SJZ Tags

-
IRM-01-5
MEAN WELL USA Inc.

-
IRM-01-12
MEAN WELL USA Inc.

-
IRM-01-3.3
MEAN WELL USA Inc.

-
IRM-02-5
MEAN WELL USA Inc.

-
IRM-02-12
MEAN WELL USA Inc.

-
IRM-02-15
MEAN WELL USA Inc.

-
IRM-03-24
MEAN WELL USA Inc.

-
IRM-03-5
MEAN WELL USA Inc.

-
IRM-03-3.3
MEAN WELL USA Inc.

-
IRM-03-15
MEAN WELL USA Inc.

-
IRM-03-12
MEAN WELL USA Inc.

-
ZP05S1200WB
Zettler Magnetics
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

