Electroswitch B8600
- Part No.:
- B8600
- Manufacturer:
- Electroswitch
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
B8600.pdf
- Description:
- SWITCH PUSH DPDT 0.5A 28V
- Quantity:
- Payment:

- Shipping:

Inventory:2,559
Please send an inquiry. Send us your inquiry, and we will respond immediately.
B8600 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Electroswitch
- Series:
- B8000
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Through Hole, Right Angle
- Type:
- Standard
- Circuit:
- DPDT
- Switch Function:
- On-Mom
- Current Rating (Amps):
- 500mA (DC)
- Voltage Rating - AC:
- -
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Plunger for Cap
- Actuator Marking:
- No Marking
- Color - Actuator/Cap:
- -
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- PC Pin
- Ingress Protection:
- -
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -20°C ~ 70°C
B8600 FAQ
1.How can I place an order for B8600 through Aetrix?
Please submit a Request for Quotation (RFQ) for B8600 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for B8600 reliable?
The price and inventory of B8600 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for B8600 is usually 5 days.
3.What payment methods are accepted for B8600?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for B8600 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for B8600?
B8600 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your B8600 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for B8600?
For technical support, including B8600 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your B8600 requirements.
6.How does Aetrix verify that B8600 is sourced from the original manufacturer or authorized distributors?
All B8600 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that B8600 meets industry standards.
7.What is the process for return or replacement of B8600?
All B8600 units undergo pre-shipment inspection (PSI). If there is an issue with B8600, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The B8600 part is unused and in its original packaging.
Return procedure for B8600:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
B8600 Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

