WeEn Semiconductors BUJ100,126
- Part No.:
- BUJ100,126
- Manufacturer:
- WeEn Semiconductors
- Category:
- Single Bipolar Transistors
- Package:
- TO-226-3, TO-92-3 (TO-226AA) Formed Leads
- Datasheet:
-
BUJ100,126.pdf
- Description:
- TRANS NPN 400V 1A TO-92-3
- Quantity:
- Payment:

- Shipping:

Inventory:8,236
Please send an inquiry. Send us your inquiry, and we will respond immediately.
BUJ100,126 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- WeEn Semiconductors
- Series:
- -
- Package/Case:
- TO-226-3, TO-92-3 (TO-226AA) Formed Leads
- Packaging:
- Tape & Box (TB)
- Product Status:
- Active
- Transistor Type:
- NPN
- Current - Collector (Ic) (Max):
- 1 A
- Voltage - Collector Emitter Breakdown (Max):
- 400 V
- Vce Saturation (Max) @ Ib, Ic:
- 1V @ 150mA, 750mA
- Current - Collector Cutoff (Max):
- 100µA
- DC Current Gain (hFE) (Min) @ Ic, Vce:
- 9 @ 750mA, 5V
- Power - Max:
- 2 W
- Frequency - Transition:
- -
- Operating Temperature:
- 150°C (TJ)
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- Through Hole
- Supplier Device Package:
- TO-92-3
BUJ100,126 FAQ
1.How can I place an order for BUJ100,126 through Aetrix?
Please submit a Request for Quotation (RFQ) for BUJ100,126 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for BUJ100,126 reliable?
The price and inventory of BUJ100,126 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for BUJ100,126 is usually 5 days.
3.What payment methods are accepted for BUJ100,126?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for BUJ100,126 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for BUJ100,126?
BUJ100,126 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your BUJ100,126 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for BUJ100,126?
For technical support, including BUJ100,126 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your BUJ100,126 requirements.
6.How does Aetrix verify that BUJ100,126 is sourced from the original manufacturer or authorized distributors?
All BUJ100,126 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that BUJ100,126 meets industry standards.
7.What is the process for return or replacement of BUJ100,126?
All BUJ100,126 units undergo pre-shipment inspection (PSI). If there is an issue with BUJ100,126, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The BUJ100,126 part is unused and in its original packaging.
Return procedure for BUJ100,126:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
BUJ100,126 Tags

-
MMBT3906LT1G
onsemi

-
MMBT3904-7-F
Diodes Incorporated

-
MMBT3904LT1G
onsemi

-
MMBT3906-7-F
Diodes Incorporated

-
MMBT3904-TP
Micro Commercial Co

-
MMBT2222A-7-F
Diodes Incorporated

-
BC846BLT1G
onsemi

-
BC847B,215
Nexperia USA Inc.

-
SMMBT3904LT1G
onsemi

-
MMBT2222A-TP
Micro Commercial Co

-
MMBTA06LT1G
onsemi

-
MMBT2222ALT1G
onsemi
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

,TO-226_straightlead.jpg)