onsemi CNY171FVM
- Part No.:
- CNY171FVM
- Manufacturer:
- onsemi
- Package:
- 6-SMD, Gull Wing
- Datasheet:
-
CNY171FVM.pdf
- Description:
- OPTOISO 4.17KV TRANS W/BASE 6SMD
- Quantity:
- Payment:

- Shipping:

Inventory:3,958
Please send an inquiry. Send us your inquiry, and we will respond immediately.
CNY171FVM Specifications
- Product attributes
- Attribute value
- Manufacturer:
- onsemi
- Series:
- -
- Package/Case:
- 6-SMD, Gull Wing
- Packaging:
- Tube
- Product Status:
- Obsolete
- Number of Channels:
- 1
- Voltage - Isolation:
- 4170Vrms
- Current Transfer Ratio (Min):
- 40% @ 10mA
- Current Transfer Ratio (Max):
- 80% @ 10mA
- Turn On / Turn Off Time (Typ):
- 2µs, 3µs
- Rise / Fall Time (Typ):
- 4µs, 3.5µs (Max)
- Input Type:
- DC
- Output Type:
- Transistor with Base
- Voltage - Output (Max):
- 70V
- Current - Output / Channel:
- 50mA
- Voltage - Forward (Vf) (Typ):
- 1.35V
- Current - DC Forward (If) (Max):
- 60 mA
- Vce Saturation (Max):
- 400mV
- Grade:
- -
- Qualification:
- -
- Operating Temperature:
- -40°C ~ 100°C
- Mounting Type:
- Surface Mount
- Supplier Device Package:
- 6-SMD
CNY171FVM FAQ
1.How can I place an order for CNY171FVM through Aetrix?
Please submit a Request for Quotation (RFQ) for CNY171FVM on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for CNY171FVM reliable?
The price and inventory of CNY171FVM are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for CNY171FVM is usually 5 days.
3.What payment methods are accepted for CNY171FVM?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for CNY171FVM transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for CNY171FVM?
CNY171FVM orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your CNY171FVM order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for CNY171FVM?
For technical support, including CNY171FVM datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your CNY171FVM requirements.
6.How does Aetrix verify that CNY171FVM is sourced from the original manufacturer or authorized distributors?
All CNY171FVM products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that CNY171FVM meets industry standards.
7.What is the process for return or replacement of CNY171FVM?
All CNY171FVM units undergo pre-shipment inspection (PSI). If there is an issue with CNY171FVM, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The CNY171FVM part is unused and in its original packaging.
Return procedure for CNY171FVM:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
CNY171FVM Tags

-
LTV-816S
Lite-On Inc.

-
CNY17-3
Vishay Semiconductor Opto Division

-
LTV-816S-TA1
Lite-On Inc.

-
LTV-817
Lite-On Inc.

-
LTV-817S
Lite-On Inc.

-
LTV-817S-TA1
Lite-On Inc.

-
LTV-826S
Lite-On Inc.

-
FOD817CSD
onsemi
.jpg)
-
LTV-356T
Lite-On Inc.

-
LTV-357T
Lite-On Inc.

-
VO618A-3X017T
Vishay Semiconductor Opto Division

-
4N35S-TA1
Lite-On Inc.
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

