Belden Inc. CSC19C2024BK
- Part No.:
- CSC19C2024BK
- Manufacturer:
- Belden Inc.
- Category:
- Power, Line Cables and Extension Cords
- Package:
- Description:
- CORD IEC320-C19 - IEC320-C20 2'
- Quantity:
- Payment:

- Shipping:

Inventory:2,239
Please send an inquiry. Send us your inquiry, and we will respond immediately.
CSC19C2024BK Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Belden Inc.
- Series:
- -
- Packaging:
- Bulk
- Product Status:
- Active
- Style:
- Male Pins (Blades) to Female Sockets (Slots)
- 1st Connector:
- IEC 320-C19
- 2nd Connector:
- IEC 320-C20
- Number of Conductors:
- 3
- Cord Type:
- -
- Wire Gauge:
- -
- Shielding:
- Unshielded
- Length:
- 2.00' (609.6mm)
- Approval Agency Marking:
- cUL, UL
- Approved Countries:
- -
- Color:
- Black
- Voltage Rating:
- -
- Current Rating (Amps):
- 20A
- Operating Temperature:
- -
- Features:
- Locking
CSC19C2024BK FAQ
1.How can I place an order for CSC19C2024BK through Aetrix?
Please submit a Request for Quotation (RFQ) for CSC19C2024BK on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for CSC19C2024BK reliable?
The price and inventory of CSC19C2024BK are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for CSC19C2024BK is usually 5 days.
3.What payment methods are accepted for CSC19C2024BK?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for CSC19C2024BK transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for CSC19C2024BK?
CSC19C2024BK orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your CSC19C2024BK order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for CSC19C2024BK?
For technical support, including CSC19C2024BK datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your CSC19C2024BK requirements.
6.How does Aetrix verify that CSC19C2024BK is sourced from the original manufacturer or authorized distributors?
All CSC19C2024BK products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that CSC19C2024BK meets industry standards.
7.What is the process for return or replacement of CSC19C2024BK?
All CSC19C2024BK units undergo pre-shipment inspection (PSI). If there is an issue with CSC19C2024BK, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The CSC19C2024BK part is unused and in its original packaging.
Return procedure for CSC19C2024BK:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
CSC19C2024BK Tags

-
AC-C7 EU
Same Sky (Formerly CUI Devices)

-
PC-ABK001F
Bel Inc.

-
AC-C7 NA
Same Sky (Formerly CUI Devices)

-
AK500-RA-6-0.5
Assmann WSW Components
-
6010.5274
SCHURTER Inc.

-
PC-ABK002F
Bel Inc.

-
221001-01
Qualtek
.jpg)
-
4511116F703A(R)
GlobTek, Inc.

-
223020-01
Qualtek

-
AC-C13 NA
Same Sky (Formerly CUI Devices)

-
AC-C13 JP
Same Sky (Formerly CUI Devices)

-
AC15WNA
Phihong USA
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

