Carling Technologies CX1-B0-16-912-3DA-10C
- Part No.:
- CX1-B0-16-912-3DA-10C
- Manufacturer:
- Carling Technologies
- Category:
- Circuit Breakers
- Package:
- Description:
- CIRCUIT BREAKER
- Quantity:
- Payment:

- Shipping:

Inventory:2,618
Please send an inquiry. Send us your inquiry, and we will respond immediately.
CX1-B0-16-912-3DA-10C Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Carling Technologies
- Series:
- CX
- Packaging:
- Bulk
- Product Status:
- Active
- Mounting Type:
- Panel Mount
- Breaker Type:
- Magnetic (Hydraulic Delay)
- Current Rating (Amps):
- 125A
- Voltage Rating - AC:
- -
- Voltage Rating - DC:
- 300 V
- Actuator Type:
- Lever
- Number of Poles:
- 1
- Illumination:
- None
- Illumination Voltage (Nominal):
- -
- Approval Agency:
- CCC, UL1077
CX1-B0-16-912-3DA-10C FAQ
1.How can I place an order for CX1-B0-16-912-3DA-10C through Aetrix?
Please submit a Request for Quotation (RFQ) for CX1-B0-16-912-3DA-10C on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for CX1-B0-16-912-3DA-10C reliable?
The price and inventory of CX1-B0-16-912-3DA-10C are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for CX1-B0-16-912-3DA-10C is usually 5 days.
3.What payment methods are accepted for CX1-B0-16-912-3DA-10C?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for CX1-B0-16-912-3DA-10C transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for CX1-B0-16-912-3DA-10C?
CX1-B0-16-912-3DA-10C orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your CX1-B0-16-912-3DA-10C order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for CX1-B0-16-912-3DA-10C?
For technical support, including CX1-B0-16-912-3DA-10C datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your CX1-B0-16-912-3DA-10C requirements.
6.How does Aetrix verify that CX1-B0-16-912-3DA-10C is sourced from the original manufacturer or authorized distributors?
All CX1-B0-16-912-3DA-10C products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that CX1-B0-16-912-3DA-10C meets industry standards.
7.What is the process for return or replacement of CX1-B0-16-912-3DA-10C?
All CX1-B0-16-912-3DA-10C units undergo pre-shipment inspection (PSI). If there is an issue with CX1-B0-16-912-3DA-10C, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The CX1-B0-16-912-3DA-10C part is unused and in its original packaging.
Return procedure for CX1-B0-16-912-3DA-10C:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
CX1-B0-16-912-3DA-10C Tags

-
QMB-153-11C3N-3BA
Qualtek
-
4404.0002
SCHURTER Inc.
-
4404.0105
SCHURTER Inc.
-
W57-XB7A4A10-5
TE Connectivity Potter & Brumfield Relays

-
W28-XQ1A-3
TE Connectivity Potter & Brumfield Relays

-
W54-XB1A4A10-20
TE Connectivity Potter & Brumfield Relays
-
W57-XB7A4A10-20
TE Connectivity Potter & Brumfield Relays

-
W54-XB1A4A10-30
TE Connectivity Potter & Brumfield Relays

-
W51-A121B1-15
TE Connectivity Potter & Brumfield Relays
-
W57-XB1A7A10-5
TE Connectivity Potter & Brumfield Relays

-
W28-XQ1A-8
TE Connectivity Potter & Brumfield Relays

-
W28-XQ1A-4
TE Connectivity Potter & Brumfield Relays
Tech Hub
A technical comparison of level-sensitive latches and edge-triggered flip-flops, covering timing windows, setup and hold limits, master–slave operation, time borrowing, race-through, HDL inference and…
A D latch stores one bit while Enable controls when data can pass. This reference covers gate-level operation, truth tables, transparency, setup and hold timing, LE versus OE, common ICs and practical …
An SR latch stores one bit through cross-coupled feedback. This engineering reference covers NOR and NAND implementations, truth tables, forbidden-state recovery, gated operation, switch debouncing, fa…
Latch circuits retain one bit through feedback. This technical reference covers SR and D latches, truth tables, transparency, timing limits, latch-versus-flip-flop behavior, applications and common log…
An engineering guide to LED driver operation, constant-current and constant-voltage outputs, linear and switching topologies, dimming, IC selection, calculations, replacement compatibility, and fault c…
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.

