C&K E101SYCKE
- Part No.:
- E101SYCKE
- Manufacturer:
- C&K
- Category:
- Toggle Switches
- Package:
- Datasheet:
-
E101SYCKE.pdf
- Description:
- SWITCH TOGGLE SPDT 0.4VA 20V
- Quantity:
- Payment:

- Shipping:

Inventory:3,115
Please send an inquiry. Send us your inquiry, and we will respond immediately.
E101SYCKE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- E
- Packaging:
- Bulk
- Product Status:
- Obsolete
- Mounting Type:
- Panel Mount
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 0.4VA (AC/DC)
- Voltage Rating - AC:
- 20 V
- Voltage Rating - DC:
- 20 V
- Actuator Type:
- Standard Round
- Actuator Length:
- 10.16mm
- Illumination:
- Non-Illuminated
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- PC Pin
- Panel Cutout Dimensions:
- Circular - 6.35mm Dia
- Bushing Thread:
- 1/4-40
- Ingress Protection:
- IP57 - Dust Protected, Waterproof
- Features:
- Epoxy Sealed Terminals
- Operating Temperature:
- -30°C ~ 85°C
E101SYCKE FAQ
1.How can I place an order for E101SYCKE through Aetrix?
Please submit a Request for Quotation (RFQ) for E101SYCKE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for E101SYCKE reliable?
The price and inventory of E101SYCKE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for E101SYCKE is usually 5 days.
3.What payment methods are accepted for E101SYCKE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for E101SYCKE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for E101SYCKE?
E101SYCKE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your E101SYCKE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for E101SYCKE?
For technical support, including E101SYCKE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your E101SYCKE requirements.
6.How does Aetrix verify that E101SYCKE is sourced from the original manufacturer or authorized distributors?
All E101SYCKE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that E101SYCKE meets industry standards.
7.What is the process for return or replacement of E101SYCKE?
All E101SYCKE units undergo pre-shipment inspection (PSI). If there is an issue with E101SYCKE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The E101SYCKE part is unused and in its original packaging.
Return procedure for E101SYCKE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
E101SYCKE Tags

-
ANT11SECQE
CIT Relay and Switch

-
ANT11SEBQE
CIT Relay and Switch

-
ANT11SF1CQE
CIT Relay and Switch

-
ANT13SECQE
CIT Relay and Switch

-
100SP1T1B4M2QE
E-Switch

-
100SP1T1B1M1QEH
E-Switch

-
100SP1T1B1M2QEH
E-Switch

-
100SP1T2B3M1QEH
E-Switch

-
100SP3T1B1M2QE
E-Switch

-
200AWMSP1T2A1M2RE
E-Switch

-
100SP3T1B1M2QEH
E-Switch

-
200USP1T1A1M2RE
E-Switch
Tech Hub
An engineering guide to LED driver operation, constant-current and constant-voltage outputs, linear and switching topologies, dimming, IC selection, calculations, replacement compatibility, and fault c…
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…

