Eaton Electrical E47BCC07
- Part No.:
- E47BCC07
- Manufacturer:
- Eaton Electrical
- Category:
- Limit Switches
- Package:
- Description:
- COMPACT LIMIT SWITCH, ROLLER PLU
- Quantity:
- Payment:

- Shipping:

Inventory:2,701
Please send an inquiry. Send us your inquiry, and we will respond immediately.
E47BCC07 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Eaton Electrical
- Series:
- E47
- Packaging:
- Bulk
- Product Status:
- Active
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 5A (AC), 4A (DC)
- Voltage Rating - AC:
- 250 V
- Voltage Rating - DC:
- 30 V
- Actuator Type:
- Roller Plunger
- Mounting Type:
- Chassis Mount
- Termination Style:
- Cable Leads
- Ingress Protection:
- -
- Features:
- -
- Operating Force:
- -
- Release Force:
- -
- Operating Position:
- 0.618" (15.7mm)
- Pretravel:
- 0.071" (1.8mm)
- Differential Travel:
- 0.008" (0.2mm)
- Overtravel:
- 0.118" (3.0mm)
- Operating Temperature:
- -10°C ~ 70°C
E47BCC07 FAQ
1.How can I place an order for E47BCC07 through Aetrix?
Please submit a Request for Quotation (RFQ) for E47BCC07 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for E47BCC07 reliable?
The price and inventory of E47BCC07 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for E47BCC07 is usually 5 days.
3.What payment methods are accepted for E47BCC07?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for E47BCC07 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for E47BCC07?
E47BCC07 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your E47BCC07 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for E47BCC07?
For technical support, including E47BCC07 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your E47BCC07 requirements.
6.How does Aetrix verify that E47BCC07 is sourced from the original manufacturer or authorized distributors?
All E47BCC07 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that E47BCC07 meets industry standards.
7.What is the process for return or replacement of E47BCC07?
All E47BCC07 units undergo pre-shipment inspection (PSI). If there is an issue with E47BCC07, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The E47BCC07 part is unused and in its original packaging.
Return procedure for E47BCC07:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
E47BCC07 Tags
-
ESE-22MV21T
Panasonic Electronic Components

-
ESE-11SV1
Panasonic Electronic Components

-
ESE-24MH1T
Panasonic Electronic Components
-
ESE-18R11B
Panasonic Electronic Components

-
HDP001L
C&K
-
ESE-13V01D
Panasonic Electronic Components

-
ESE-16J001
Panasonic Electronic Components

-
D2F-01
Omron Electronics Inc-EMC Div

-
ESE-24CMH9T
Panasonic Electronic Components
-
DS-080-C PA
C&K

-
ESE-24MV1T
Panasonic Electronic Components

-
D3C-1220
Omron Electronics Inc-EMC Div
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
