UMW GBLC03CI-LF-T7
- Part No.:
- GBLC03CI-LF-T7
- Manufacturer:
- UMW
- Category:
- TVS Diodes
- Package:
- SC-76, SOD-323
- Datasheet:
-
GBLC03CI-LF-T7.pdf
- Description:
- ESD SUPPRESSOR DIODE TVS BI-DIR
- Quantity:
- Payment:

- Shipping:

Inventory:4,459
Please send an inquiry. Send us your inquiry, and we will respond immediately.
GBLC03CI-LF-T7 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- UMW
- Package/Case:
- SC-76, SOD-323
- Series:
- UMW
- Packaging:
- Tape & Reel (TR)
- Product Status:
- Active
- Type:
- Zener
- Unidirectional Channels:
- -
- Bidirectional Channels:
- 1
- Voltage - Reverse Standoff (Typ):
- 3V
- Voltage - Breakdown (Min):
- 4V
- Voltage - Clamping (Max) @ Ipp:
- 7V
- Current - Peak Pulse (10/1000µs):
- 1A (8/20µs)
- Power - Peak Pulse:
- 250W
- Power Line Protection:
- No
- Applications:
- Ethernet, USB
- Capacitance @ Frequency:
- 0.6pF @ 1MHz
- Operating Temperature:
- -55°C ~ 150°C (TA)
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- Surface Mount
- Supplier Device Package:
- SOD-323
GBLC03CI-LF-T7 FAQ
1.How can I place an order for GBLC03CI-LF-T7 through Aetrix?
Please submit a Request for Quotation (RFQ) for GBLC03CI-LF-T7 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for GBLC03CI-LF-T7 reliable?
The price and inventory of GBLC03CI-LF-T7 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for GBLC03CI-LF-T7 is usually 5 days.
3.What payment methods are accepted for GBLC03CI-LF-T7?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for GBLC03CI-LF-T7 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for GBLC03CI-LF-T7?
GBLC03CI-LF-T7 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your GBLC03CI-LF-T7 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for GBLC03CI-LF-T7?
For technical support, including GBLC03CI-LF-T7 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your GBLC03CI-LF-T7 requirements.
6.How does Aetrix verify that GBLC03CI-LF-T7 is sourced from the original manufacturer or authorized distributors?
All GBLC03CI-LF-T7 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that GBLC03CI-LF-T7 meets industry standards.
7.What is the process for return or replacement of GBLC03CI-LF-T7?
All GBLC03CI-LF-T7 units undergo pre-shipment inspection (PSI). If there is an issue with GBLC03CI-LF-T7, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The GBLC03CI-LF-T7 part is unused and in its original packaging.
Return procedure for GBLC03CI-LF-T7:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
GBLC03CI-LF-T7 Tags

-
ESD9B5.0ST5G
onsemi

-
DESD3V3E1BL-7B
Diodes Incorporated

-
ESD5Z3.3T1G
onsemi

-
D5V0H1B2LP-7B
Diodes Incorporated

-
D5V0P1B2LP-7B
Diodes Incorporated

-
DESD5V0U1BA-7
Diodes Incorporated

-
ESD5Z5.0T1G
onsemi

-
DESD5V0U1BB-7
Diodes Incorporated

-
D12V0L1B2LP-7B
Diodes Incorporated

-
PESD2V0Y1BSFYL
Nexperia USA Inc.

-
DF2S5M4CT,L3F
Toshiba Semiconductor and Storage

-
D5V0L1B2WS-7
Diodes Incorporated
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

