ARTESYN / Advanced Energy LCM1500Q-T-8
- Part No.:
- LCM1500Q-T-8
- Manufacturer:
- ARTESYN / Advanced Energy
- Category:
- AC DC Converters
- Package:
- Datasheet:
-
LCM1500Q-T-8.pdf
- Description:
- AC/DC CONVERTER 24V 1500W
- Quantity:
- Payment:

- Shipping:

Inventory:1,990
Please send an inquiry. Send us your inquiry, and we will respond immediately.
LCM1500Q-T-8 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- ARTESYN / Advanced Energy
- Series:
- LCM1500 (1500W)
- Packaging:
- Bulk
- Product Status:
- Active
- Type:
- Front End
- Number of Outputs:
- 1
- Voltage - Input:
- 90 ~ 264 VAC
- Voltage - Output 1:
- 24V
- Voltage - Output 2:
- -
- Voltage - Output 3:
- -
- Voltage - Output 4:
- -
- Voltage - Output 5:
- -
- Voltage - Output 6:
- -
- Current - Output 1:
- 67 A
- Current - Output 2:
- -
- Current - Output 3:
- -
- Current - Output 4:
- -
- Current - Output 5:
- -
- Current - Output 6:
- -
- Power (Watts):
- 1500W
- Applications:
- ITE (Commercial), Medical
- Voltage - Isolation:
- 4 kV
- Operating Temperature:
- -40°C ~ 70°C (With Derating)
- Features:
- Adjustable Output, I2C Interface, Load Sharing, PFC, Remote On/Off, Remote Sense, Universal Input
- Mounting Type:
- Chassis Mount
- Size / Dimension:
- 10.00" L x 5.20" W x 2.43" H (254.0mm x 132.0mm x 61.7mm)
LCM1500Q-T-8 FAQ
1.How can I place an order for LCM1500Q-T-8 through Aetrix?
Please submit a Request for Quotation (RFQ) for LCM1500Q-T-8 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for LCM1500Q-T-8 reliable?
The price and inventory of LCM1500Q-T-8 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for LCM1500Q-T-8 is usually 5 days.
3.What payment methods are accepted for LCM1500Q-T-8?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for LCM1500Q-T-8 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for LCM1500Q-T-8?
LCM1500Q-T-8 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your LCM1500Q-T-8 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for LCM1500Q-T-8?
For technical support, including LCM1500Q-T-8 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your LCM1500Q-T-8 requirements.
6.How does Aetrix verify that LCM1500Q-T-8 is sourced from the original manufacturer or authorized distributors?
All LCM1500Q-T-8 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that LCM1500Q-T-8 meets industry standards.
7.What is the process for return or replacement of LCM1500Q-T-8?
All LCM1500Q-T-8 units undergo pre-shipment inspection (PSI). If there is an issue with LCM1500Q-T-8, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The LCM1500Q-T-8 part is unused and in its original packaging.
Return procedure for LCM1500Q-T-8:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
LCM1500Q-T-8 Tags

-
EPS-15-24
MEAN WELL USA Inc.

-
RS-15-12
MEAN WELL USA Inc.

-
RS-15-5
MEAN WELL USA Inc.

-
RS-15-24
MEAN WELL USA Inc.

-
RS-15-15
MEAN WELL USA Inc.

-
RS-15-3.3
MEAN WELL USA Inc.

-
EPS-15-12
MEAN WELL USA Inc.

-
RS-25-5
MEAN WELL USA Inc.

-
RS-25-12
MEAN WELL USA Inc.

-
RS-25-24
MEAN WELL USA Inc.

-
LRS-35-24
MEAN WELL USA Inc.

-
LRS-35-12
MEAN WELL USA Inc.
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
