C&K MA10L2NCGF
- Part No.:
- MA10L2NCGF
- Manufacturer:
- C&K
- Category:
- Rotary Switches
- Package:
- Datasheet:
-
MA10L2NCGF.pdf
- Description:
- SWITCH ROTARY 10POS 250MA 125V
- Quantity:
- Payment:

- Shipping:

Inventory:1,966
Please send an inquiry. Send us your inquiry, and we will respond immediately.
MA10L2NCGF Specifications
- Product attributes
- Attribute value
- Manufacturer:
- C&K
- Series:
- M
- Packaging:
- Tray
- Product Status:
- Active
- Number of Positions:
- 10
- Index Stops:
- Fixed
- Number of Decks:
- 1
- Number of Poles per Deck:
- 1
- Circuit per Deck:
- SP10T
- Contact Timing:
- Non-Shorting (BBM)
- Current Rating (Amps):
- 250mA (AC/DC)
- Voltage Rating - AC:
- 125 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Screwdriver Slot
- Actuator Length:
- Flush
- Angle of Throw:
- 36°
- Contact Material:
- Copper Alloy
- Contact Finish:
- Gold
- Mounting Type:
- Panel Mount, Through Hole
- Termination Style:
- PC Pin
- Features:
- IP67 - Dust Tight, Waterproof
- Depth Behind Panel:
- 10.42mm
MA10L2NCGF FAQ
1.How can I place an order for MA10L2NCGF through Aetrix?
Please submit a Request for Quotation (RFQ) for MA10L2NCGF on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for MA10L2NCGF reliable?
The price and inventory of MA10L2NCGF are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for MA10L2NCGF is usually 5 days.
3.What payment methods are accepted for MA10L2NCGF?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for MA10L2NCGF transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for MA10L2NCGF?
MA10L2NCGF orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your MA10L2NCGF order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for MA10L2NCGF?
For technical support, including MA10L2NCGF datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your MA10L2NCGF requirements.
6.How does Aetrix verify that MA10L2NCGF is sourced from the original manufacturer or authorized distributors?
All MA10L2NCGF products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that MA10L2NCGF meets industry standards.
7.What is the process for return or replacement of MA10L2NCGF?
All MA10L2NCGF units undergo pre-shipment inspection (PSI). If there is an issue with MA10L2NCGF, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The MA10L2NCGF part is unused and in its original packaging.
Return procedure for MA10L2NCGF:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
MA10L2NCGF Tags
-
RM103772BCB
C&K
-
RM100772BCB
C&K
-
RM104772BCB
C&K

-
KC43A30.001NPS
E-Switch
-
A10303RNZQ
C&K

-
A10505RNZQ
C&K

-
KC52A10.001NPS
E-Switch
-
A11215RNCQ
C&K

-
A11205RNCQ
C&K

-
A11203RNCQ
C&K

-
A20605RNCQ
C&K

-
RTAP31S12M25NS
C&K
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

