Garmin Canada Inc. N550M4CC-TRAY
- Part No.:
- N550M4CC-TRAY
- Manufacturer:
- Garmin Canada Inc.
- Category:
- RF Transceiver Modules and Modems
- Package:
- 17-SMD Module
- Datasheet:
-
N550M4CC-TRAY.pdf
- Description:
- RF TXRX MOD BT TH SMD
- Quantity:
- Payment:

- Shipping:

Inventory:4,098
Please send an inquiry. Send us your inquiry, and we will respond immediately.
N550M4CC-TRAY Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Garmin Canada Inc.
- Series:
- N5
- Package/Case:
- 17-SMD Module
- Packaging:
- Tray
- Product Status:
- Obsolete
- Programmable:
- Not Verified
- RF Family/Standard:
- Bluetooth
- Protocol:
- Bluetooth v4.1
- Modulation:
- -
- Frequency:
- 2.4GHz
- Data Rate:
- 60kbps
- Power - Output:
- 4dBm
- Sensitivity:
- -93dBm
- Serial Interfaces:
- I2C, SPI, UART
- Antenna Type:
- Integrated, Trace
- Utilized IC / Part:
- nRF51422
- Memory Size:
- 256kB Flash, 16kB RAM
- Voltage - Supply:
- 1.8V ~ 3.6V
- Current - Receiving:
- 16mA
- Current - Transmitting:
- 16mA
- Mounting Type:
- Surface Mount
- Operating Temperature:
- -40°C ~ 85°C
N550M4CC-TRAY FAQ
1.How can I place an order for N550M4CC-TRAY through Aetrix?
Please submit a Request for Quotation (RFQ) for N550M4CC-TRAY on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for N550M4CC-TRAY reliable?
The price and inventory of N550M4CC-TRAY are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for N550M4CC-TRAY is usually 5 days.
3.What payment methods are accepted for N550M4CC-TRAY?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for N550M4CC-TRAY transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for N550M4CC-TRAY?
N550M4CC-TRAY orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your N550M4CC-TRAY order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for N550M4CC-TRAY?
For technical support, including N550M4CC-TRAY datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your N550M4CC-TRAY requirements.
6.How does Aetrix verify that N550M4CC-TRAY is sourced from the original manufacturer or authorized distributors?
All N550M4CC-TRAY products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that N550M4CC-TRAY meets industry standards.
7.What is the process for return or replacement of N550M4CC-TRAY?
All N550M4CC-TRAY units undergo pre-shipment inspection (PSI). If there is an issue with N550M4CC-TRAY, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The N550M4CC-TRAY part is unused and in its original packaging.
Return procedure for N550M4CC-TRAY:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
N550M4CC-TRAY Tags

-
ESP32-C3FH4
Espressif Systems

-
ESP32-S2FH4
Espressif Systems

-
ESP32-S2FN4R2
Espressif Systems

-
ESP32-C3-MINI-1-N4
Espressif Systems

-
ESP32-C3-WROOM-02-N4
Espressif Systems

-
ESP32-C3-MINI-1U-N4
Espressif Systems

-
ESP32-C3-MINI-1U-H4
Espressif Systems

-
ESP32-C3-WROOM-02U-N4
Espressif Systems

-
ESP32-H2-MINI-1-N4
Espressif Systems

-
ESP32-H2-MINI-1-H4
Espressif Systems
_viewa.jpg)
-
ESP32-MINI-1-N4
Espressif Systems

-
ESP32-S2-MINI-2-N4R2
Espressif Systems
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
