Standex-Meder Electronics ORD 228VL/15-20 AT
- Part No.:
- ORD 228VL/15-20 AT
- Manufacturer:
- Standex-Meder Electronics
- Category:
- Magnetic, Reed Switches
- Package:
- Datasheet:
-
ORD 228VL/15-20 AT.pdf
- Description:
- SWITCH REED SPST-NO 500MA 100V
- Quantity:
- Payment:

- Shipping:

Inventory:894
Please send an inquiry. Send us your inquiry, and we will respond immediately.
ORD 228VL/15-20 AT Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Standex-Meder Electronics
- Series:
- ORD
- Packaging:
- Bulk
- Product Status:
- Active
- Type:
- Glass Body Reed
- Circuit:
- SPST-NO
- Operate Range:
- 15 ~ 20AT
- Release Range:
- -
- Current - Switching:
- 500mA (AC/DC)
- Voltage - Switching AC:
- 100 V
- Voltage - Switching DC:
- 100 V
- Power - Rated:
- 10W
- Operate Time:
- 0.4 ms
- Release Time:
- 0.05 ms
- Mounting Type:
- Through Hole
- Termination Style:
- Axial
- Length - Overall:
- 1.744" (44.30mm)
- Size - Body:
- 0.087" Dia x 0.551" L (2.20mm x 14.00mm)
- Height Above Board:
- -
- Operating Temperature:
- -
- Capacitance:
- 0.3 pF
- Current - Carry:
- 1A (AC/DC)
ORD 228VL/15-20 AT FAQ
1.How can I place an order for ORD 228VL/15-20 AT through Aetrix?
Please submit a Request for Quotation (RFQ) for ORD 228VL/15-20 AT on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for ORD 228VL/15-20 AT reliable?
The price and inventory of ORD 228VL/15-20 AT are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for ORD 228VL/15-20 AT is usually 5 days.
3.What payment methods are accepted for ORD 228VL/15-20 AT?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for ORD 228VL/15-20 AT transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for ORD 228VL/15-20 AT?
ORD 228VL/15-20 AT orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your ORD 228VL/15-20 AT order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for ORD 228VL/15-20 AT?
For technical support, including ORD 228VL/15-20 AT datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your ORD 228VL/15-20 AT requirements.
6.How does Aetrix verify that ORD 228VL/15-20 AT is sourced from the original manufacturer or authorized distributors?
All ORD 228VL/15-20 AT products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that ORD 228VL/15-20 AT meets industry standards.
7.What is the process for return or replacement of ORD 228VL/15-20 AT?
All ORD 228VL/15-20 AT units undergo pre-shipment inspection (PSI). If there is an issue with ORD 228VL/15-20 AT, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The ORD 228VL/15-20 AT part is unused and in its original packaging.
Return procedure for ORD 228VL/15-20 AT:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
ORD 228VL/15-20 AT Tags

-
ORD 324/10-15 AT
Standex-Meder Electronics

-
FLEX-14-10-15
Littelfuse Inc.

-
ORD 211/10-15 AT
Standex-Meder Electronics

-
RI-02SMDM-1015-G1
Comus International

-
RI-70GP0710
Comus International

-
KSK-1A66-1015
Standex-Meder Electronics

-
59165-1-S-00-D
Littelfuse Inc.
-
MDSR-7-10-20
Littelfuse Inc.

-
MK16-C-2
Standex-Meder Electronics
-
MDSR-7-10-25
Littelfuse Inc.

-
MDSM-4R-12-18
Littelfuse Inc.

-
MK15-B-2
Standex-Meder Electronics
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

