McGill Microwave Systems RG400-per-meter
- Part No.:
- RG400-per-meter
- Manufacturer:
- McGill Microwave Systems
- Category:
- Coaxial Cables (RF)
- Package:
- Datasheet:
-
RG400-per-meter.pdf
- Description:
- RG400 Coax price per 1m Long
- Quantity:
- Payment:

- Shipping:

Inventory:9,912
Please send an inquiry. Send us your inquiry, and we will respond immediately.
RG400-per-meter Specifications
- Product attributes
- Attribute value
- Manufacturer:
- McGill Microwave Systems
- Series:
- -
- Packaging:
- Spool
- Product Status:
- Active
- Cable Type:
- Coaxial
- Cable Group:
- RG-400
- Wire Gauge:
- -
- Conductor Strand:
- -
- Jacket (Insulation) Material:
- -
- Jacket (Insulation) Diameter:
- -
- Shield Type:
- -
- Impedance:
- -
- Length:
- -
- Jacket Color:
- -
- Usage:
- -
- Features:
- -
RG400-per-meter FAQ
1.How can I place an order for RG400-per-meter through Aetrix?
Please submit a Request for Quotation (RFQ) for RG400-per-meter on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for RG400-per-meter reliable?
The price and inventory of RG400-per-meter are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for RG400-per-meter is usually 5 days.
3.What payment methods are accepted for RG400-per-meter?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for RG400-per-meter transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for RG400-per-meter?
RG400-per-meter orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your RG400-per-meter order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for RG400-per-meter?
For technical support, including RG400-per-meter datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your RG400-per-meter requirements.
6.How does Aetrix verify that RG400-per-meter is sourced from the original manufacturer or authorized distributors?
All RG400-per-meter products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that RG400-per-meter meets industry standards.
7.What is the process for return or replacement of RG400-per-meter?
All RG400-per-meter units undergo pre-shipment inspection (PSI). If there is an issue with RG400-per-meter, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The RG400-per-meter part is unused and in its original packaging.
Return procedure for RG400-per-meter:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
RG400-per-meter Tags

-
C1155.41.01
Prysmian Group

-
8240 0101000
Belden Inc.

-
8240 010500
Belden Inc.

-
8259 0101000
Belden Inc.
-
C1176A.41.01
Prysmian Group

-
1694A 0101000
Belden Inc.

-
8262 010500
Belden Inc.

-
7805R 008500
Belden Inc.

-
8216 010100
Belden Inc.

-
LMR-195
Amphenol Times Microwave Systems

-
LMR-240-DB
Amphenol Times Microwave Systems

-
LMR-240
Amphenol Times Microwave Systems
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

