Festo Corporation SMT-10M-NS-24V-E-0,3-Q-M8D
- Part No.:
- SMT-10M-NS-24V-E-0,3-Q-M8D
- Manufacturer:
- Festo Corporation
- Category:
- Proximity Sensors
- Package:
- Module
- Datasheet:
-
SMT-10M-NS-24V-E-0,3-Q-M8D.pdf
- Description:
- PROXIMITY SWITCH
- Quantity:
- Payment:

- Shipping:

Inventory:1,285
Please send an inquiry. Send us your inquiry, and we will respond immediately.
SMT-10M-NS-24V-E-0,3-Q-M8D Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Festo Corporation
- Series:
- SMT
- Package/Case:
- Module
- Packaging:
- Bulk
- Product Status:
- Active
- Sensor Type:
- Inductive
- Sensing Distance:
- -
- Output Type:
- NPN-NO, 3-Wire
- Response Frequency:
- -
- Shielding:
- Unshielded
- Material - Body:
- Polyamide (PA), Stainless Steel
- Voltage - Supply:
- 5V ~ 30V
- Termination Style:
- Cable with Connector
- Operating Temperature:
- -40°C ~ 70°C
- Ingress Protection:
- IP65, IP68
- Indicator:
- LED
SMT-10M-NS-24V-E-0,3-Q-M8D FAQ
1.How can I place an order for SMT-10M-NS-24V-E-0,3-Q-M8D through Aetrix?
Please submit a Request for Quotation (RFQ) for SMT-10M-NS-24V-E-0,3-Q-M8D on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for SMT-10M-NS-24V-E-0,3-Q-M8D reliable?
The price and inventory of SMT-10M-NS-24V-E-0,3-Q-M8D are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for SMT-10M-NS-24V-E-0,3-Q-M8D is usually 5 days.
3.What payment methods are accepted for SMT-10M-NS-24V-E-0,3-Q-M8D?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for SMT-10M-NS-24V-E-0,3-Q-M8D transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for SMT-10M-NS-24V-E-0,3-Q-M8D?
SMT-10M-NS-24V-E-0,3-Q-M8D orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your SMT-10M-NS-24V-E-0,3-Q-M8D order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for SMT-10M-NS-24V-E-0,3-Q-M8D?
For technical support, including SMT-10M-NS-24V-E-0,3-Q-M8D datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your SMT-10M-NS-24V-E-0,3-Q-M8D requirements.
6.How does Aetrix verify that SMT-10M-NS-24V-E-0,3-Q-M8D is sourced from the original manufacturer or authorized distributors?
All SMT-10M-NS-24V-E-0,3-Q-M8D products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that SMT-10M-NS-24V-E-0,3-Q-M8D meets industry standards.
7.What is the process for return or replacement of SMT-10M-NS-24V-E-0,3-Q-M8D?
All SMT-10M-NS-24V-E-0,3-Q-M8D units undergo pre-shipment inspection (PSI). If there is an issue with SMT-10M-NS-24V-E-0,3-Q-M8D, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The SMT-10M-NS-24V-E-0,3-Q-M8D part is unused and in its original packaging.
Return procedure for SMT-10M-NS-24V-E-0,3-Q-M8D:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
SMT-10M-NS-24V-E-0,3-Q-M8D Tags

-
TSP15D10C-01
TDK Corporation

-
GX-304S-A-N
Panasonic Industrial Automation Sales

-
LDC0851HDSGR
Texas Instruments

-
TMD27253M OLGA8 LF T&RDP
ams-OSRAM USA INC.

-
SX9331IULTRT
Semtech Corporation

-
GX-318M-A-N
Panasonic Industrial Automation Sales

-
SX9324ICSTRT
Semtech Corporation

-
SX9330ICSTRT
Semtech Corporation

-
PL-Q873-02
KEMET

-
CTI302
Comus International

-
PGN-SP-001
Comus International

-
GX-318MLK-A-P-Z
Panasonic Industrial Automation Sales
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
