Seiko Instruments SR1120SW-5SE
- Part No.:
- SR1120SW-5SE
- Manufacturer:
- Seiko Instruments
- Category:
- Batteries Non-Rechargeable (Primary)
- Package:
- Datasheet:
-
SR1120SW-5SE.pdf
- Description:
- BATTERY SILVER OXIDE COIN 11.6MM
- Quantity:
- Payment:

- Shipping:

Inventory:2,493
Please send an inquiry. Send us your inquiry, and we will respond immediately.
SR1120SW-5SE Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Seiko Instruments
- Series:
- SR1120
- Packaging:
- Bulk
- Product Status:
- Active
- Battery Chemistry:
- Silver Oxide
- Battery Cell Size:
- Coin, 11.6mm
- Voltage - Rated:
- -
- Capacity:
- 53mAh
- Size / Dimension:
- 0.46" Dia x 0.08" H (11.6mm x 2.0mm)
- Termination Style:
- Requires Holder
- Features:
- -
SR1120SW-5SE FAQ
1.How can I place an order for SR1120SW-5SE through Aetrix?
Please submit a Request for Quotation (RFQ) for SR1120SW-5SE on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for SR1120SW-5SE reliable?
The price and inventory of SR1120SW-5SE are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for SR1120SW-5SE is usually 5 days.
3.What payment methods are accepted for SR1120SW-5SE?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for SR1120SW-5SE transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for SR1120SW-5SE?
SR1120SW-5SE orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your SR1120SW-5SE order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for SR1120SW-5SE?
For technical support, including SR1120SW-5SE datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your SR1120SW-5SE requirements.
6.How does Aetrix verify that SR1120SW-5SE is sourced from the original manufacturer or authorized distributors?
All SR1120SW-5SE products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that SR1120SW-5SE meets industry standards.
7.What is the process for return or replacement of SR1120SW-5SE?
All SR1120SW-5SE units undergo pre-shipment inspection (PSI). If there is an issue with SR1120SW-5SE, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The SR1120SW-5SE part is unused and in its original packaging.
Return procedure for SR1120SW-5SE:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
SR1120SW-5SE Tags

-
CR2025
Murata Electronics

-
CR2032
Jauch Quartz

-
CR2025VP
Energizer Battery Company

-
CR2032
Panasonic - BSG

-
CR2032VP
Energizer Battery Company

-
E92VP
Energizer Battery Company

-
CR2032
FDK America, Inc., a member of Fujitsu Group

-
CR2016
Panasonic - BSG

-
CR2016
Murata Electronics

-
A76
Energizer Battery Company

-
E96VP
Energizer Battery Company

-
LR6XWA/BXU
Panasonic - BSG
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
