Adam Tech SW-PB8-AA00A2QE-3
- Part No.:
- SW-PB8-AA00A2QE-3
- Manufacturer:
- Adam Tech
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
SW-PB8-AA00A2QE-3.pdf
- Description:
- ALTERNATE ACTING PUSHBUTTON SWIT
- Quantity:
- Payment:

- Shipping:

Inventory:117
Please send an inquiry. Send us your inquiry, and we will respond immediately.
SW-PB8-AA00A2QE-3 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Adam Tech
- Series:
- SW
- Packaging:
- Box
- Product Status:
- Active
- Mounting Type:
- Panel Mount, Rear
- Type:
- Standard
- Circuit:
- SPDT
- Switch Function:
- On-On
- Current Rating (Amps):
- 6A (AC/DC)
- Voltage Rating - AC:
- 125 V
- Voltage Rating - DC:
- 28 V
- Actuator Type:
- Round, Plunger
- Actuator Marking:
- No Marking
- Color - Actuator/Cap:
- -
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- -
- Termination Style:
- PC Pin
- Ingress Protection:
- -
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -30°C ~ 85°C
SW-PB8-AA00A2QE-3 FAQ
1.How can I place an order for SW-PB8-AA00A2QE-3 through Aetrix?
Please submit a Request for Quotation (RFQ) for SW-PB8-AA00A2QE-3 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for SW-PB8-AA00A2QE-3 reliable?
The price and inventory of SW-PB8-AA00A2QE-3 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for SW-PB8-AA00A2QE-3 is usually 5 days.
3.What payment methods are accepted for SW-PB8-AA00A2QE-3?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for SW-PB8-AA00A2QE-3 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for SW-PB8-AA00A2QE-3?
SW-PB8-AA00A2QE-3 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your SW-PB8-AA00A2QE-3 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for SW-PB8-AA00A2QE-3?
For technical support, including SW-PB8-AA00A2QE-3 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your SW-PB8-AA00A2QE-3 requirements.
6.How does Aetrix verify that SW-PB8-AA00A2QE-3 is sourced from the original manufacturer or authorized distributors?
All SW-PB8-AA00A2QE-3 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that SW-PB8-AA00A2QE-3 meets industry standards.
7.What is the process for return or replacement of SW-PB8-AA00A2QE-3?
All SW-PB8-AA00A2QE-3 units undergo pre-shipment inspection (PSI). If there is an issue with SW-PB8-AA00A2QE-3, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The SW-PB8-AA00A2QE-3 part is unused and in its original packaging.
Return procedure for SW-PB8-AA00A2QE-3:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
SW-PB8-AA00A2QE-3 Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

