WeEn Semiconductors TB100EP
- Part No.:
- TB100EP
- Manufacturer:
- WeEn Semiconductors
- Category:
- Single Bipolar Transistors
- Package:
- TO-226-3, TO-92-3 (TO-226AA)
- Datasheet:
-
TB100EP.pdf
- Description:
- TRANS NPN 700V 1A TO-92-3
- Quantity:
- Payment:

- Shipping:

Inventory:6,025
Please send an inquiry. Send us your inquiry, and we will respond immediately.
TB100EP Specifications
- Product attributes
- Attribute value
- Manufacturer:
- WeEn Semiconductors
- Series:
- -
- Package/Case:
- TO-226-3, TO-92-3 (TO-226AA)
- Packaging:
- Tape & Box (TB)
- Product Status:
- Active
- Transistor Type:
- NPN
- Current - Collector (Ic) (Max):
- 1 A
- Voltage - Collector Emitter Breakdown (Max):
- 700 V
- Vce Saturation (Max) @ Ib, Ic:
- 1V @ 150mA, 750mA
- Current - Collector Cutoff (Max):
- 100µA
- DC Current Gain (hFE) (Min) @ Ic, Vce:
- 14 @ 100mA, 5V
- Power - Max:
- 2 W
- Frequency - Transition:
- -
- Operating Temperature:
- 150°C
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- Through Hole
- Supplier Device Package:
- TO-92-3
TB100EP FAQ
1.How can I place an order for TB100EP through Aetrix?
Please submit a Request for Quotation (RFQ) for TB100EP on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for TB100EP reliable?
The price and inventory of TB100EP are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for TB100EP is usually 5 days.
3.What payment methods are accepted for TB100EP?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for TB100EP transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for TB100EP?
TB100EP orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your TB100EP order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for TB100EP?
For technical support, including TB100EP datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your TB100EP requirements.
6.How does Aetrix verify that TB100EP is sourced from the original manufacturer or authorized distributors?
All TB100EP products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that TB100EP meets industry standards.
7.What is the process for return or replacement of TB100EP?
All TB100EP units undergo pre-shipment inspection (PSI). If there is an issue with TB100EP, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The TB100EP part is unused and in its original packaging.
Return procedure for TB100EP:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
TB100EP Tags

-
MMBT3906LT1G
onsemi

-
MMBT3904-7-F
Diodes Incorporated

-
MMBT3904LT1G
onsemi

-
MMBT3906-7-F
Diodes Incorporated

-
MMBT3904-TP
Micro Commercial Co

-
MMBT2222A-7-F
Diodes Incorporated

-
BC846BLT1G
onsemi

-
BC847B,215
Nexperia USA Inc.

-
SMMBT3904LT1G
onsemi

-
MMBT2222A-TP
Micro Commercial Co

-
MMBTA06LT1G
onsemi

-
MMBT2222ALT1G
onsemi
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

