Traco Power TCK-076
- Part No.:
- TCK-076
- Manufacturer:
- Traco Power
- Category:
- Common Mode Chokes
- Package:
- Horizontal, 4 PC Pin
- Datasheet:
-
TCK-076.pdf
- Description:
- CMC 55UH 5.7A 2LN TH
- Quantity:
- Payment:

- Shipping:

Inventory:154
Please send an inquiry. Send us your inquiry, and we will respond immediately.
TCK-076 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Traco Power
- Package/Case:
- Horizontal, 4 PC Pin
- Filter Type:
- -
- Number of Lines:
- 2
- Impedance @ Frequency:
- -
- Current Rating (Max):
- 55 µH @ 100 kHz
- DC Resistance (DCR) (Max):
- 5.7A
- Voltage Rating - DC:
- 8.5mOhm
- Voltage Rating - AC:
- 500V
- Operating Temperature:
- -
- Ratings:
- -40°C ~ 105°C
- Approval Agency:
- -
- Features:
- -
- Mounting Type:
- -
- Size / Dimension:
- -
- Height (Max):
- -
TCK-076 FAQ
1.How can I place an order for TCK-076 through Aetrix?
Please submit a Request for Quotation (RFQ) for TCK-076 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for TCK-076 reliable?
The price and inventory of TCK-076 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for TCK-076 is usually 5 days.
3.What payment methods are accepted for TCK-076?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for TCK-076 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for TCK-076?
TCK-076 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your TCK-076 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for TCK-076?
For technical support, including TCK-076 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your TCK-076 requirements.
6.How does Aetrix verify that TCK-076 is sourced from the original manufacturer or authorized distributors?
All TCK-076 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that TCK-076 meets industry standards.
7.What is the process for return or replacement of TCK-076?
All TCK-076 units undergo pre-shipment inspection (PSI). If there is an issue with TCK-076, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The TCK-076 part is unused and in its original packaging.
Return procedure for TCK-076:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
TCK-076 Tags
-4-Lead.jpg)
-
DLM0NSN900HY2D
Murata Electronics
-4-Lead.jpg)
-
DLM0NSM900HY2D
Murata Electronics

-
DLM0QSN900HY2D
Murata Electronics

-
TCM0605M-900-2P-T201
TDK Corporation

-
LCFE121002A900TG
Littelfuse Inc.

-
DLM11SN900HZ2L
Murata Electronics

-
ACM2012H-381-2P-T05
TDK Corporation

-
SRF2012-900YA
Bourns Inc.

-
ACM2012-900-2P-T002
TDK Corporation

-
ACM2012-361-2P-T002
TDK Corporation

-
ACM2012-121-2P-T002
TDK Corporation

-
ACM2012D-900-2P-T00
TDK Corporation
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

