Traco Power TMLM 05105
- Part No.:
- TMLM 05105
- Manufacturer:
- Traco Power
- Category:
- AC DC Converters
- Package:
- 4-DIP Module
- Datasheet:
-
TMLM 05105.pdf
- Description:
- AC/DC CONVERTER 5V 5W
- Quantity:
- Payment:

- Shipping:

Inventory:2,697
Please send an inquiry. Send us your inquiry, and we will respond immediately.
TMLM 05105 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Traco Power
- Series:
- TMLM (5W)
- Package/Case:
- 4-DIP Module
- Packaging:
- Box
- Product Status:
- Obsolete
- Type:
- Enclosed
- Number of Outputs:
- 1
- Voltage - Input:
- 90 ~ 264 VAC, 120 ~ 370 VDC
- Voltage - Output 1:
- 5V
- Voltage - Output 2:
- -
- Voltage - Output 3:
- -
- Voltage - Output 4:
- -
- Current - Output (Max):
- 1A
- Power (Watts):
- 5 W
- Applications:
- ITE (Commercial)
- Features:
- Universal Input
- Operating Temperature:
- -25°C ~ 60°C (With Derating)
- Efficiency:
- 71%
- Mounting Type:
- Through Hole
- Size / Dimension:
- 2.00" L x 1.00" W x 0.60" H (50.8mm x 25.4mm x 15.2mm)
- Approval Agency:
- CE, cURus
- Standard Number:
- -
TMLM 05105 FAQ
1.How can I place an order for TMLM 05105 through Aetrix?
Please submit a Request for Quotation (RFQ) for TMLM 05105 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for TMLM 05105 reliable?
The price and inventory of TMLM 05105 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for TMLM 05105 is usually 5 days.
3.What payment methods are accepted for TMLM 05105?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for TMLM 05105 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for TMLM 05105?
TMLM 05105 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your TMLM 05105 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for TMLM 05105?
For technical support, including TMLM 05105 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your TMLM 05105 requirements.
6.How does Aetrix verify that TMLM 05105 is sourced from the original manufacturer or authorized distributors?
All TMLM 05105 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that TMLM 05105 meets industry standards.
7.What is the process for return or replacement of TMLM 05105?
All TMLM 05105 units undergo pre-shipment inspection (PSI). If there is an issue with TMLM 05105, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The TMLM 05105 part is unused and in its original packaging.
Return procedure for TMLM 05105:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
TMLM 05105 Tags

-
IRM-01-5
MEAN WELL USA Inc.

-
IRM-01-12
MEAN WELL USA Inc.

-
IRM-01-3.3
MEAN WELL USA Inc.

-
IRM-02-5
MEAN WELL USA Inc.

-
IRM-02-12
MEAN WELL USA Inc.

-
IRM-02-15
MEAN WELL USA Inc.

-
IRM-03-24
MEAN WELL USA Inc.

-
IRM-03-5
MEAN WELL USA Inc.

-
IRM-03-3.3
MEAN WELL USA Inc.

-
IRM-03-15
MEAN WELL USA Inc.

-
IRM-03-12
MEAN WELL USA Inc.

-
ZP05S1200WB
Zettler Magnetics
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…

