Schneider Electric ZB5AW062
- Part No.:
- ZB5AW062
- Manufacturer:
- Schneider Electric
- Category:
- Pushbutton Switches
- Package:
- Datasheet:
-
ZB5AW062.pdf
- Description:
- COMPLETE BODY/CONTACT ASSEMBLY A
- Quantity:
- Payment:

- Shipping:

Inventory:4,485
Please send an inquiry. Send us your inquiry, and we will respond immediately.
ZB5AW062 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Schneider Electric
- Series:
- Harmony XB5
- Packaging:
- Box
- Product Status:
- Active
- Mounting Type:
- Panel Mount, Front
- Type:
- Standard, Illuminated
- Circuit:
- SPST-NC
- Switch Function:
- Off-On
- Current Rating (Amps):
- 6A (AC), 550mA (DC)
- Voltage Rating - AC:
- 120 V
- Voltage Rating - DC:
- 125 V
- Actuator Type:
- Rectangular, Button (Not Included)
- Actuator Marking:
- -
- Color - Actuator/Cap:
- -
- Illumination Type, Color:
- -
- Illumination Voltage (Nominal):
- 250 VAC
- Termination Style:
- Screw Terminal
- Ingress Protection:
- -
- Features:
- -
- Panel Cutout Dimensions:
- -
- Operating Temperature:
- -40°C ~ 70°C
ZB5AW062 FAQ
1.How can I place an order for ZB5AW062 through Aetrix?
Please submit a Request for Quotation (RFQ) for ZB5AW062 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for ZB5AW062 reliable?
The price and inventory of ZB5AW062 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for ZB5AW062 is usually 5 days.
3.What payment methods are accepted for ZB5AW062?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for ZB5AW062 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for ZB5AW062?
ZB5AW062 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your ZB5AW062 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for ZB5AW062?
For technical support, including ZB5AW062 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your ZB5AW062 requirements.
6.How does Aetrix verify that ZB5AW062 is sourced from the original manufacturer or authorized distributors?
All ZB5AW062 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that ZB5AW062 meets industry standards.
7.What is the process for return or replacement of ZB5AW062?
All ZB5AW062 units undergo pre-shipment inspection (PSI). If there is an issue with ZB5AW062, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The ZB5AW062 part is unused and in its original packaging.
Return procedure for ZB5AW062:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
ZB5AW062 Tags

-
PBH2UEESNPNAGX
E-Switch

-
MX1A-11NW
Cherry Americas LLC

-
MX1A-E1NW
Cherry Americas LLC

-
ML1A-11JW
Cherry Americas LLC

-
MX1A-11NN
Cherry Americas LLC

-
D6C90 F2 LFS
C&K

-
D6R90 F2 LFS
C&K

-
D6R90 F1 LFS
C&K

-
PS1024ABLK
E-Switch

-
PBH2UOANAGX
E-Switch

-
PN11SHNA03QE
C&K

-
GPBS-800N
CW Industries
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

