Bel Fuse Inc. C1F 250
- Part No.:
- C1F 250
- Manufacturer:
- Bel Fuse Inc.
- Category:
- Fuses
- Package:
- Datasheet:
-
C1F 250.pdf
- Description:
- FUSE BRD MT 250MA 125VAC 63VDC
- Quantity:
- Payment:

- Shipping:

Inventory:23,617
Please send an inquiry. Send us your inquiry, and we will respond immediately.
C1F 250 Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Bel Fuse Inc.
- Package/Case:
- Series:
- C1F
- Packaging:
- Tape & Reel (TR)
- Product Status:
- Active
- Mounting Type:
- Surface Mount
- Fuse Type:
- Board Mount (Cartridge Style Excluded)
- Current Rating (Amps):
- 250 mA
- Voltage Rating - AC:
- 125 V
- Voltage Rating - DC:
- 63 V
- Response Time:
- Fast Blow
- Breaking Capacity @ Rated Voltage:
- 100A AC, 50A DC
- Melting I²t:
- 2.0E-4
- Approval Agency:
- AEC-Q200, cURus
- Operating Temperature:
- -55°C ~ 125°C
- Color:
- -
- Size / Dimension:
- 0.126" L x 0.062" W (3.20mm x 1.58mm)
C1F 250 FAQ
1.How can I place an order for C1F 250 through Aetrix?
Please submit a Request for Quotation (RFQ) for C1F 250 on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for C1F 250 reliable?
The price and inventory of C1F 250 are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for C1F 250 is usually 5 days.
3.What payment methods are accepted for C1F 250?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for C1F 250 transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for C1F 250?
C1F 250 orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your C1F 250 order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for C1F 250?
For technical support, including C1F 250 datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your C1F 250 requirements.
6.How does Aetrix verify that C1F 250 is sourced from the original manufacturer or authorized distributors?
All C1F 250 products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that C1F 250 meets industry standards.
7.What is the process for return or replacement of C1F 250?
All C1F 250 units undergo pre-shipment inspection (PSI). If there is an issue with C1F 250, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The C1F 250 part is unused and in its original packaging.
Return procedure for C1F 250:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
C1F 250 Tags

-
C1F 8
Bel Fuse Inc.

-
C1F 3
Bel Fuse Inc.

-
0686F6000-01
Bel Fuse Inc.

-
C2Q 1.5
Bel Fuse Inc.

-
0686F1000-01
Bel Fuse Inc.

-
0679L8000-05
Bel Fuse Inc.

-
ERB-RD2R00X
Panasonic Electronic Components

-
ERB-RE0R50V
Panasonic Electronic Components

-
ERB-RE2R00V
Panasonic Electronic Components

-
ERB-RE4R00V
Panasonic Electronic Components

-
ERB-RE1R00V
Panasonic Electronic Components

-
C1F 250
Bel Fuse Inc.
Tech Hub
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
