Linear Integrated Systems, Inc. DPAD2 TO-72 4L
- Part No.:
- DPAD2 TO-72 4L
- Manufacturer:
- Linear Integrated Systems, Inc.
- Category:
- Diode Arrays
- Package:
- TO-206AF, TO-72-4 Metal Can
- Datasheet:
-
DPAD2 TO-72 4L.pdf
- Description:
- DIODE ARRAY GP 45V 50MA TO-72-4
- Quantity:
- Payment:

- Shipping:

Inventory:500
Please send an inquiry. Send us your inquiry, and we will respond immediately.
DPAD2 TO-72 4L Specifications
- Product attributes
- Attribute value
- Manufacturer:
- Linear Integrated Systems, Inc.
- Series:
- DPAD
- Package/Case:
- TO-206AF, TO-72-4 Metal Can
- Packaging:
- Bulk
- Product Status:
- Active
- Diode Configuration:
- 2 Independent
- Technology:
- Standard
- Voltage - DC Reverse (Vr) (Max):
- 45 V
- Current - Average Rectified (Io) (per Diode):
- 50mA
- Voltage - Forward (Vf) (Max) @ If:
- 1.5 V @ 1 mA
- Speed:
- Small Signal =< 200mA (Io), Any Speed
- Reverse Recovery Time (trr):
- -
- Current - Reverse Leakage @ Vr:
- 2 pA @ 20 V
- Operating Temperature - Junction:
- -55°C ~ 150°C
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- Through Hole
- Supplier Device Package:
- TO-72-4
DPAD2 TO-72 4L FAQ
1.How can I place an order for DPAD2 TO-72 4L through Aetrix?
Please submit a Request for Quotation (RFQ) for DPAD2 TO-72 4L on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for DPAD2 TO-72 4L reliable?
The price and inventory of DPAD2 TO-72 4L are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for DPAD2 TO-72 4L is usually 5 days.
3.What payment methods are accepted for DPAD2 TO-72 4L?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for DPAD2 TO-72 4L transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for DPAD2 TO-72 4L?
DPAD2 TO-72 4L orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your DPAD2 TO-72 4L order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for DPAD2 TO-72 4L?
For technical support, including DPAD2 TO-72 4L datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your DPAD2 TO-72 4L requirements.
6.How does Aetrix verify that DPAD2 TO-72 4L is sourced from the original manufacturer or authorized distributors?
All DPAD2 TO-72 4L products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that DPAD2 TO-72 4L meets industry standards.
7.What is the process for return or replacement of DPAD2 TO-72 4L?
All DPAD2 TO-72 4L units undergo pre-shipment inspection (PSI). If there is an issue with DPAD2 TO-72 4L, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The DPAD2 TO-72 4L part is unused and in its original packaging.
Return procedure for DPAD2 TO-72 4L:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
DPAD2 TO-72 4L Tags

-
BAV99-7-F
Diodes Incorporated

-
BAT54C-7-F
Diodes Incorporated

-
BAV99,215
Nexperia USA Inc.

-
BAT54SLT1G
onsemi

-
BAV70LT1G
onsemi

-
BAT54CLT1G
onsemi

-
BAT54S-7-F
Diodes Incorporated

-
BAV99LT1G
onsemi

-
BAT54S,215
Nexperia USA Inc.

-
BAS40-04LT1G
onsemi

-
MMBD1503-TP
Micro Commercial Co

-
BAV99WT1G
onsemi
Tech Hub
Operational amplifier guide covering op amp basics, feedback, ideal vs real op amps, common configurations, buffer circuits, offset, bias current, gain-bandwidth, slew rate, rail-to-rail limits and sel…
Jumper cables guide covering safe connection order, red and black clamp placement, final ground connection, cable gauge, length, clamp quality, copper vs CCA cables, jump starter comparison and battery…
LDO regulator guide covering low dropout voltage, power dissipation, thermal design, PSRR, output noise, capacitor stability, adjustable LDO circuits, LDO vs buck converter and datasheet selection chec…
Conditional Access Module guide covering CAM meaning, CI/CI+ interface, smart card authorization, DVB security workflow, TV and set-top box compatibility, internal electronics, ESD protection, connecto…
Guide to electronic component obsolescence covering EOL risk, PCN/PDN notices, last-time buy planning, replacement options, form-fit-function validation, counterfeit risk and BOM lifecycle management.
18650 battery guide covering lithium-ion cell basics, 3.6V/3.7V voltage, 4.2V charging, mAh and Wh capacity, protected cells, chargers, BMS, series-parallel packs, holders, welding and sourcing checks.…
Hall effect sensor guide covering working principle, linear and digital sensors, Arduino circuits, current sensing, speed detection, automotive applications, A3144 examples, signal filtering and datash…
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…

