STMicroelectronics STPS20150CFP
- Part No.:
- STPS20150CFP
- Manufacturer:
- STMicroelectronics
- Category:
- Diode Arrays
- Package:
- TO-220-3 Full Pack
- Datasheet:
-
STPS20150CFP.pdf
- Description:
- DIODE ARR SCHOT 150V 10A TO220FP
- Quantity:
- Payment:

- Shipping:

Inventory:448
Please send an inquiry. Send us your inquiry, and we will respond immediately.
STPS20150CFP Specifications
- Product attributes
- Attribute value
- Manufacturer:
- STMicroelectronics
- Series:
- -
- Package/Case:
- TO-220-3 Full Pack
- Packaging:
- Tube
- Product Status:
- Active
- Diode Configuration:
- 1 Pair Common Cathode
- Technology:
- Schottky
- Voltage - DC Reverse (Vr) (Max):
- 150 V
- Current - Average Rectified (Io) (per Diode):
- 10A
- Voltage - Forward (Vf) (Max) @ If:
- 920 mV @ 10 A
- Speed:
- Fast Recovery =< 500ns, > 200mA (Io)
- Reverse Recovery Time (trr):
- -
- Current - Reverse Leakage @ Vr:
- 5 µA @ 150 V
- Operating Temperature - Junction:
- 175°C (Max)
- Grade:
- -
- Qualification:
- -
- Mounting Type:
- Through Hole
- Supplier Device Package:
- TO-220FP
STPS20150CFP FAQ
1.How can I place an order for STPS20150CFP through Aetrix?
Please submit a Request for Quotation (RFQ) for STPS20150CFP on Aetrix. Our sales agent will provide a competitive quotation and guide you through the order confirmation once you accept the terms.
2.Are the price and stock information for STPS20150CFP reliable?
The price and inventory of STPS20150CFP are updated periodically and may fluctuate due to market conditions. Stock and pricing data are typically refreshed every 24 hours. Quotation validity for STPS20150CFP is usually 5 days.
3.What payment methods are accepted for STPS20150CFP?
We accept Wire Transfer, PayPal, Credit Card, Western Union, MoneyGram, and Escrow for STPS20150CFP transactions.
Note: Certain payment methods may incur a processing fee.
4.How is shipping managed for STPS20150CFP?
STPS20150CFP orders can be shipped via leading logistics carriers, including DHL, UPS, FedEx, TNT, or Registered Mail.
Once your STPS20150CFP order is processed, you will receive an email with the shipment details and tracking number.
Note: Tracking information may take up to 24 hours to appear. Express delivery typically takes 3–5 business days.
5.How can I obtain technical support or documentation for STPS20150CFP?
For technical support, including STPS20150CFP datasheets, pinout diagrams, or application guidance, please contact our engineering support team. They can provide detailed documentation and assistance for your STPS20150CFP requirements.
6.How does Aetrix verify that STPS20150CFP is sourced from the original manufacturer or authorized distributors?
All STPS20150CFP products on Aetrix are procured from qualified distributors and authorized channels. Our dedicated quality assurance team conducts strict verification, including traceability checks and, if necessary, third-party testing. This ensures that STPS20150CFP meets industry standards.
7.What is the process for return or replacement of STPS20150CFP?
All STPS20150CFP units undergo pre-shipment inspection (PSI). If there is an issue with STPS20150CFP, returns or replacements are accepted under the following conditions:
1.Quantity discrepancies, incorrect items, or visible external defects (such as breakage or corrosion), acknowledged by Aetrix.
2.The issue is reported within 90 days of delivery.
3.The STPS20150CFP part is unused and in its original packaging.
Return procedure for STPS20150CFP:
1.Submit a request within 90 days.
2.Obtain a Return Material Authorization (RMA) from Aetrix.
STPS20150CFP Tags

-
BAV99-7-F
Diodes Incorporated

-
BAT54C-7-F
Diodes Incorporated

-
BAV99,215
Nexperia USA Inc.

-
BAT54SLT1G
onsemi

-
BAV70LT1G
onsemi

-
BAT54CLT1G
onsemi

-
BAT54S-7-F
Diodes Incorporated

-
BAV99LT1G
onsemi

-
BAT54S,215
Nexperia USA Inc.

-
BAS40-04LT1G
onsemi

-
MMBD1503-TP
Micro Commercial Co

-
BAV99WT1G
onsemi
Tech Hub
Product Change Notification guide for electronic components, covering PCN meaning, PCN vs PDN/EOL, common change types, risk levels, form-fit-function review, engineering validation, BOM control, LTB/L…
A practical guide to blend door actuators, covering HVAC function, symptoms, location, AC and heater issues, reset and calibration, replacement cost, electrical diagnosis, compatibility checks, and rep…
Engineering guide to Raspberry Pi alternatives, covering chip-level differences, Orange Pi, ROCK, Jetson, Banana Pi, NanoPi, Compute Module, Pico, GPIO, camera, HAT compatibility, and replacement risks…
Engineering guide to dynamic load response testing for high-current buck converters, covering load step setup, slew rate, Vcore undershoot, overshoot, recovery time, probe location, output capacitors a…
Engineering guide to output capacitor selection for ASIC Vcore rails, covering bulk capacitors, polymer capacitors, MLCC decoupling, DC bias, ESR, ESL, placement, transient response and substitution ri…
Engineering guide to high-current ASIC Vcore rails, covering 12-phase buck architecture, PMBus control, dynamic load testing, output capacitor networks, smart power stage selection, thermal design and …
Voltage regulator guide covering linear, LDO, 7805, Zener, adjustable, buck, VRM and alternator regulators, with design checks, testing methods, troubleshooting and datasheet-based selection.
Amplifier guide covering voltage, current and power amplification, gain, feedback, amplifier classes, audio and RF applications, op-amp circuits, transimpedance amplifiers, datasheet selection and trou…
Machine vision system guide covering components, inspection workflow, camera and lens selection, FOV, pixel resolution, motion blur, strobe lighting, bandwidth, 2D/3D vision, integration, troubleshooti…
Electronic devices and circuits guide covering passive components, semiconductors, analog and digital circuits, circuit theory, practical calculations, troubleshooting, datasheet selection, and learnin…

